Project #E1111          Bid Date: 10/30/2025 @ 3:00 pm PDT

Kansas Street SW Roadway Improvements, City of Orting, WA #2025-08

$7,000,000 to $8,000,000

Low Bid:
Bids Received: 6
Apparent Low BidActive Construction Inc.$ 4,687,687.00
2ndMiles Resouces, LLC$ 5,387,197.77
3rdCeccanti, Inc.$ 5,565,328.86

Plans
Specs
Addendum #1
Addendum #1 Plans
Addendum #2
Addendum #2 Plan
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Orting
City Clerk’s Office
104 Bridge Street S
PO Box 489
Orting, WA 98360
360-893-2219

Issued by:
www.bxwa.com

Engineer:
Parametrix
1019 39th Ave SE, Suite 100
Puyallup, WA 98374
253-604-6600
Fax: 855-542-6353

Contact: Cynthia Clark, PE
cclark@parametrix.com

Notes:
Pre-Bid Meeting Information: 10/16 @ 10:00 am at City Hall and virtual via Teams
https://teams.microsoft.com/dl/launcher/launcher.html?url=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_OWEyZWIyZGQtNTk2MC00MGIwLWJkZjgtZDE5MzZlZmNmMTNj%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%25228ca7c1e9-54b4-4528-9591-ebde29ca383a%2522%252c%2522Oid%2522%253a%252283aa3fa0-4407-45f8-9134-39dca13fce43%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=a99f449b-b6e6-40c4-90d8-a2690f287409&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true

Meeting ID: 220 788 066 460 3
Passcode: 48W3vU29

Description:
The Kansas Street SW Improvement Project aims to enhance the streetscape and upgrade utilities along Kansas Street SW, spanning from Calistoga Street W to Harman Way S/SR 162. The roadway and utility improvements include the following:
• A two-lane roadway; one travel lane in each direction
• Installation of curbs, gutters, sidewalks, and landscaping
• Utility adjustments and upgrades
• Enhanced illumination and traffic channelization
• Signage installation
• Construction of curb bulbs at intersections to support traffic calming
Storm drainage, lighting, and water main improvements will be integrated into existing infrastructure and the current gravity sewer main will remain in place.

The project is broken up into three separate schedules, Schedule A, B and C. Schedule A includes all taxable work on Kansas Street SW from Coe Lane to Harman Way S/SR 162. Schedule B includes all water main reconstruction on the project. Schedule C includes the stormwater and roadway replacement work from the Kansas Street Outfall to the Coe Lane and Kansas Street SW.

All work shall be done in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.