EvergreenHealth Urology Clinic, EvergreenHealth, Kirkland, WA - Plans
Cover Sheet
G-002 General Requirements Notes
G-103 F3 Life Safety Plan
A-001 Architectural Notes and Symbols
A-113 F3 Demolition Plan
A-114 F3 Ceiling Demolition Plan
A-123 F3 Floor Plan Overall
A-123A F3 Floor Plan Quadrant North
A-123B F3 Floor Plan Quadrant South
A-133 F3 Reflected Ceiling Plan Overall
A-133A F3 Reflected Ceiling Plan Quadrant North
A-133B F3 Reflected Ceiling Plan Quadrant South
A-143A F3 Finish Plan Quadrant North
A-143B F3 Finish Plan Quadrant South
A-144 Finish Legend
A-153A F3 Furniture / Equipment Plan Quadrant North
A-153B F3 Furniture / Equipment Plan Quadrant South
A-400 Mounting Heights, Equipment Schedules
A-401 Enlarged Plan - Exam Typical
A-402 Enlarged Plan - Exam Rooms
A-403 Enlarged Plan - Exam Rooms
A-404 Enlarged Plan - Exam Rooms
A-405 Enlarged Plan - Procedure Room 1
A-406 Enlarged Plan - Procedure Room 2
A-407 Enlarged Plan - Procedure Room 3
A-408 Enlarged Plan - Clean Work, Clinic
A-409 Enlarged Plan - Clean Work, Procedure
A-410 Enlarged Plan - Soiled Hold, Soiled Work
A-411 Enlarged Plan - Admin Offices and Corridor
A-412 Enlarged Plan - Lab
A-413 Enlarged Plan - Waiting / Reception
A-414 Enlarged Plan - Pre / Post Bays
A-415 Enlarged Plan - MA Care Team
A-416 Enlarged Plan - Nursing / Scheduling Office
A-417 Enlarged Plan - Break Room
A-418 Enlarged Plan - Toilet Rooms
A-501 Partition Types & Legend
A-502 Mullion Closure Details
A-503 Casework Details
A-504 Ceiling Details
A-505 Interior Details
A-601 Door Schedule and Opening Details
P-001 General Notes, Abbreviations and Sheet Index
P-112 Overall F2 Plumbing Demolition Plan
P-113 Overall F3 Plumbing Demolition Plan
P-122 Overall F2 Plumbing Plan
P-123 Overall F3 Plumbing Plan
P-601 Plumbing Details
P-701 Plumbing Schedules
F-113 Overall F3 Fire Protection Demolition Plan
F-123 Overall F3 Fire Protection Plan
M-001 General Notes, Abbreviations and Sheet Index
M-113 Overall F3 Mechanical Demolition Plan
M-114 Overall F3 Hydronic Demolition Plan
M-123 Overall F3 Mechanical Plan
M-124 Overall F3 Hydronic Plan
M-125 Overall F4 Mechanical Roof Plan
M-201 Zoning Plan
M-401 F3 Mechanical Room Sections
M-501 Mechanical Diagrams
M-511 Mechanical Controls
M-701 Mechanical Schedules
M-702 Room Pressurization Schedule
E0.00 Symbols and Abbreviations
E1.00 F3 Overall Lighting Demolition Plan
E1.10 F3 Overall Power Demolition Plan
E1.30 F3 Overall Systems Demolition Plan
E2.00 F3 Overall Lighting Plan
E2.01 F3 Partial Lighting Plan Quadrant North
E2.02 F3 Partial Lighting Plan Quadrant South
E3.00 F3 Overall Power Plan
E3.01 F3 Partial Power Plan Quadrant North
E3.02 F3 Partial Power Plan Quadrant South
E4.00 F3 Overall Systems Plan
E4.01 F3 Partial Systems Plan Quadrant North
E4.02 F3 Partial Systems Plan Quadrant South
E7.00 Existing One-Line Diagram
E7.01 Revised One-Line Diagram
E8.00 Panel Schedules and Load Calculations
Order Prints
Drawing List
FastBid Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.