SeaTac Airport Concourse A Port Shared Use Lounge, SeaTac, WA - Documents 07 through 19 - Project Requirements    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 220 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Document 7 - Exhibit B - Project Specific Requirements
Page 11 Document 8 - Exhibit C - Contract Doc Log
Page 24 Document 9 - Exhibit D - Schedule
Page 35 Document 10 - Exhibit E - Full Safety Plan and COVID 19 Exposure Plan
Page 137 Document 11 - Exhibit F - Subcontractor Health, Safety and Environment (HSE) Requirements
Page 147 Document 12 - Exhibit G - Quality Assurance and Quality Control (QA / QC) Requirements
Page 150 Document 13 - Exhibit H - Administration and Billing Requirements
Page 204 Document 14 - Exhibit I - Site Logistics R1 25-02-10
Page 208 Document 15 - Exhibit J - Building Information Modeling (BIM) and Technology Requirements
Page 212 Document 16 - Exhibit K - Design Build Services Rider
Page 216 Document 17 - Exhibit L - Prime Contract Flow Down - Port of Seattle
Page 219 Document 18 - Exhibit M - Night Shift Work
Page 220 Document 19 - Exhibit N - Regulated Materials Survey Report