Community Transitions - Bid Package BP-12R Metal Siding & Air Barrier System, Sheet Metal, Bellingham, WA - ASI 012 Plans

G0.01 Project Information
G0.03 Life Safety
G0.05 Assembly Types
C4.01 Storm Drain Plan
A1.12 Site Details
A1.13 Site Details
A2.00 Overall First Floor Plan
A2.01 Overall Second Floor Plan
A2.10 Overall Roof Plan
A2.50 Enlarged Toilet Plans / ADA Heights
A2.53 Enlarged Culinary Plan & Elevations
A2.54 Enlarged Culinary Plan & Elevations
A2.62 Stair 1 Enlarged Stair Details
A2.63 Stair 2 Enlarged Stair Plan & Section
A2.64 Stair 3 Enlarged Stair Plan & Section
A2.66 Enlarged Elevator Plan
A3.02 Overall Exterior Elevations
A3.03 Overall Exterior Elevations
A3.07 Window Schedule
A3.08 Window Schedule
A3.09 Window Schedule
A3.10 Door Schedule
A4.15 Wall Sections
A5.02 First Floor Finish Plan
A6.02 Toilet Elevations
A6.04 Interior Elevations
A6.09 Interior Elevations
S2.00 Foundation Plan
S2.01 Second Floor Framing Plan
S2.02 Second Floor CLT Layout Plan
S2.10 Roof Framing Plan
S2.12 Upper Roof Framing Plan
S2.13 Upper Roof CLT Layout Plan
S2.14 Enlarged Site & Stair Framing Plans
S2.15 Feature Stair and Details
S4.34 Foundation and Concrete Details
S4.43 Wood Framing Details
S4.45 Wood Framing Details
S4.50 Steel Framing Details
S4.51 Yield-Link Moment Conn Details
M1.01 Overall Foundation Plan
M2.00 Overall First Floor Plumbing Plan
M2.01 Overall Second Floor Plumbing Plan
M4.00 Overall First Floor HVAC Piping Plan
M4.01 Overall Second Floor HVAC Piping Plan
M5.01 Enlarged Plumbing Plans
E2.00 First Floor Plan - Lighting
E2.01 Second Floor Plan - Lighting
E3.00 First Floor Plan - Electrical
E3.01 Second Floor Plan - Electrical
E4.00 First Floor Plan - Comm
E5.00 First Floor Plan - ESS
E7.00 Light Fixture Schedule
E7.01 Lighting Control Schedule