Community Transitions - Bid Package BP-20 Paintings & Coatings, Bellingham, WA - Conformed Plans 1/16/26
Cover Sheet
G0.01 Project Information
G0.02 Code Review
G0.03 Life Safety
G0.04 Assembly Types
G0.05 Assembly Types
EC1.01 Energy Code
EC1.02 Energy Code Wall Sections
EC1.03 Energy Code Wall Sections
Sheet 1 Topographic Survey
C1.01 Cover Sheet & Existing Conditions
C2.01 Temporary Erosion & Sedimentation Control Plan
C2.02 Temporary Erosion & Sedimentation Control Details
C3.01 Paving & Grading Plan
C4.01 Storm Drain Plan
C5.01 Water & Sewer Plan
C6.01 Paving, Grading & Storm Drain Details
C6.02 Storm Drain Details
C6.03 Storm Drain Details
C6.04 Water Details
C6.05 Water & Sewer Details
L1.00 Site Plan
L1.01 Level 02 Roof Plan
L2.00 Planting Plan
L2.01 Planting Plan Roof and Schedule
L2.02 Planting Details
L2.03 Soil Depth Plan
L3.00 Irrigation Plan
L3.01 Irrigation Plan and Legend
L3.02 Irrigation Details
L3.03 Irrigation Details
L3.04 Irrigation Details
L3.05 Irrigation Details
L4.00 Details
L4.01 Details
A1.01 Site Plan
A1.10 Site Details - Ramp Plan & Sections
A1.11 Site Details - Ramp
A1.12 Site Details
A1.13 Site Details
A2.00 Overall First Floor Plan
A2.01 Overall Second Floor Plan
A2.02 First Floor Column Plan
A2.03 Second Floor Column Plan
A2.10 Overall Roof Plan
A2.30 First Floor Reflected Ceiling Plan
A2.31 Second Floor Reflected Ceiling Plan
A2.50 Enlarged Toilet Plans
A2.51 Enlarged Toilet Plans
A2.52 Enlarged Toilet & Office Plans
A2.53 Enlarged Culinary Plan & Elevations
A2.54 Enlarged Culinary Plan & Elevations
A2.60 Stair 1 Enlarged Plan
A2.61 Stair 1 Enlarged Sections
A2.62 Stair 1 Enlarged Stair Details
A2.63 Stair 2 Enlarged Stair Plan & Section
A2.64 Stair 3 Enlarged Stair Plan & Section
A2.65 Enlarged Stair Details
A2.66 Enlarged Elevator Plan
A3.00 Schematic Perspectives
A3.01 Schematic Perspectives
A3.02 Overall Exterior Elevations
A3.03 Overall Exterior Elevations
A3.04 Masonry Key Enlarged Elevations
A3.07 Window Schedule
A3.08 Window Schedule
A3.09 Window Schedule
A3.10 Door Schedule
A4.00 Building Sections
A4.01 Building Sections
A4.02 Building Sections
A4.03 Building Sections
A4.10 Wall Sections
A4.11 Wall Sections
A4.12 Wall Sections
A4.13 Wall Sections
A4.14 Wall Sections
A4.15 Wall Sections
A5.00 Interior Data
A5.01 Interior Data Continued
A5.02 First Floor Finish Plan
A5.03 Second Floor Finish Plan
A5.10 Interior Perspectives
A5.11 Interior Perspectives
A6.01 Interior Elevations
A6.02 Toilet Elevations
A6.03 Toilet Elevations
A6.04 Interior Elevations
A6.05 Interior Elevations
A6.06 Interior Elevations
A6.07 Interior Elevations
A6.08 Interior Elevations
A7.00 Exterior Details
A7.01 Exterior Details
A7.02 Exterior Details
A7.03 Exterior Details
A7.04 Exterior Details
A7.05 Exterior Details
A7.06 Exterior Details
A7.07 Exterior Details
A7.08 Exterior Details
A7.09 Exterior Details
A7.10 Exterior Details
A7.11 Exterior Details
A7.12 Exterior Details
A8.00 Interior Details
A8.01 Interior Details
A8.02 Interior Details
A8.03 Interior Details
A8.04 Interior Details Reception Desk
S1.00 Structural Notes
S1.01 Structural Notes
S2.00 Foundation Plan
S2.01 Second Floor Framing Plan
S2.02 Second Floor CLT Layout Plan
S2.10 Roof Framing Plan
S2.11 Roof CLT Layout Plan
S2.12 Upper Roof Framing Plan
S2.13 Upper Roof CLT Layout Plan
S2.14 Enlarged Site & Stair Framing Plans
S2.15 Feature Stair and Details
S4.30 Foundation and Concrete Details
S4.31 Foundation and Concrete Details
S4.32 Foundation and Concrete Details
S4.33 Foundation and Concrete Details
S4.40 Wood Framing Details
S4.41 Wood Framing Details
S4.42 Wood Framing Details
S4.43 Wood Framing Details
S4.44 Wood Framing Details
S4.45 Wood Framing Details
S4.46 Wood Framing Details
S4.50 Steel Framing Details
S4.51 Yield-Link Moment Conn Details
S5.01 Site Sections
S5.02 Site Sections
S5.03 Site Sections
S5.04 Site Sections
S5.05 Site Sections
M0.01 Mechanical Legend
M0.02 Mechanical Abbreviations & General Notes
M0.03 Mechanical Schedules
M0.04 Mechanical Schedules
M0.05 Mechanical Schedules
M0.06 Energy Code Notes and Schedules
M0.07 Energy Code Schedules
M0.08 Energy Code Schedules
M0.09 Ventilation and Load Schedules
M1.00 Mechanical Site Plan
M1.01 Overall Foundation Plan
M2.00 Overall First Floor Plumbing Plan
M2.01 Overall Second Floor Plumbing Plan
M3.00 Overall First Floor HVAC Plan
M3.01 Overall Second Floor HVAC Plan
M4.00 Overall First Floor HVAC Piping Plan
M4.01 Overall Second Floor HVAC Piping Plan
M5.00 Enlarged Mechanical Plans
M5.01 Enlarged Plumbing Plans
M5.02 Mechanical Sections
M6.00 Overall Mechanical Roof Plan
M7.00 Overall First Floor Fire Sprinkler Plan
M7.01 Overall Second Floor Fire Sprinkler Plan
M9.00 Mechanical Details
M9.01 Mechanical Details
M9.02 Mechanical Details
M9.03 Mechanical Details
M9.04 Mechanical Details
M9.05 Mechanical Details
M9.06 Mechanical Details
M9.07 Mechanical Details
M9.08 Mechanical Details
E1.00 Legend
E1.01 Site Plan - Electrical
E1.02 District Fiber Plan
E1.03 Site Plan - Light Calculation
E2.00 First Floor Plan - Lighting
E2.01 Second Floor Plan - Lighting
E3.00 First Floor Plan - Electrical
E3.01 Second Floor Plan - Electrical
E3.02 Roof Plan - Electrical
E3.03 Elevator Details
E4.00 First Floor Plan - Comm
E4.01 Second Floor Plan - Comm
E5.00 First Floor Plan - ESS
E5.01 Second Floor Plan - ESS
E6.00 One Line Diagram
E6.01 Comm Details
E7.00 Light Fixture Schedule
E7.01 Lighting Control Schedule
E7.02 Lighting Control Schedule
E7.03 Lighting Control Schedule
E7.04 Lighting Control Schedule
E7.05 Lighting Control Schedule
E8.00 Mechanical Schedule
E8.01 Panel Schedule
E8.02 Panel Schedule
FS0.1 Foodservice General Notes
FS1.0 Foodservice Equipment Plan
FS2.0 Foodservice Plumbing Plan
FS3.0 Foodservice Electrical Plan
FS4.0 Foodservice Special Conditions Plan
FS5.0 Foodservice Ventilation Plan
FS6.0 Exhaust Hood Details
FS6.1 Exhaust Hood Details
FS6.2 Exhaust Hood Detail
FS6.3 Exhaust Hood Details
FS6.4 Exhaust Hood Details
FS6.5 Exhaust Hood Details
FS7.0 Foodservice Elevations and Sections
FS7.1 Foodservice Elevations and Sections
FS8.0 Foodservice Standard Details