Lake Washington School District HS Additions - Eastlake High School: MACC I Bid Packages, Sammamish, WA - 2011 Conformed Plans Volume 2
G0.10 Project Information Sheet & Index of Drawings
FS1.01 Unit B - Second Floor Food Service Equipment Plan
FS1.02 Unit B - Second Floor Food Service Plumbing Plan
FS1.03 Unit B - Second Floor Food Service Electrical Plan
FS2.01 Unit B - Second Floor Food Service Equipment Plan
FS2.02 Unit B - Second Floor Food Service Equipment Plan
P1.1 Symbols & Abbreviations
P2.1 Unit A - Foundation Plumbing Plan
P2.2 Unit A - First Floor Plumbing Plan
P2.3 Unit A - Second Floor Plumbing Plan
P2.4 Unit A - Equipment Platform Plumbing Plan
P2.5 Unit B - First Floor Plumbing Plan
P2.6 Unit B - Second Floor Plumbing Plan
P2.7 Unit C - Foundation Plumbing Plan
P2.8 Unit C - Lower Level Plumbing Plan
P2.9 Unit C - First Floor Plumbing Plan
P3.1 Plumbing Schedules / Details
P3.2 Plumbing Schedules / Details
P4.1 Unit A - Enlarged Foundation Science Room Plumbing Plan
P4.2 Unit A - Enlarged First Floor Science Room Plumbing Plan
PFP.1 Unit A - First Floor Fire Protection Plan
PFP.2 Unit A - Second Floor Fire Protection Plan
PFP.3 Unit A - Equipment Platform Fire Protection Plan
PFP.4 Unit B - First Floor Fire Protection Plan
PFP.5 Unit B - Second Floor Fire Protection Plan
PFP.6 Unit C - Lower Level Fire Protection Plan
PFP.7 Unit C - First Floor Fire Protection Plan
MD.1 Unit A - Second Floor and Unit C Lower Level Mechanical Demolition Plan
MD.2 Unit B - First / Second Floor Mechanical Demolition Plan
M1.1 Mechanical Symbols and Abbreviations
M2.1 Unit A - First Floor Ventilation Plan
M2.2 Unit A - Second Floor Ventilation Plan
M2.3 Unit B - First Floor Ventilation Plan
M2.4 Unit B - Second Floor Ventilation Plan
M2.5 Unit C - Lower Level Ventilation Plan
M2.6 Unit C - First Floor Ventilation Plan
M3.1 Unit A - First Floor Piping Plan
M3.2 Unit A - Second Floor Piping Plan
M3.3 Unit C - First Floor Piping Plan
M4.1 Unit A - Equipment Platform
M5.1 Mechanical Schedules
M5.2 Air Handling Unit Schematic
M5.3 Unit A - Heating Water Schematic and Air Handling Unit Details
M5.4 Mechanical Details
M6.1 Unit A - First and Second Floor and Equipment Platform Temperature Control Plan
M6.2 Unit B - First and Second Floor Temperature Control Plan
M6.3 Unit C - First Floor and Lower Level Temperature Control Plan
ED.1 Unit A - First and Second Floor Demolition Plans
ED.2 Unit B - First Floor Demolition Plan
ED.3 Unit B - Second Floor Demolition Plan
ED.4 Unit C - Lower Level and First Floor Demolition Plans
E1.1 Electrical Symbols and Details
E1.2 Electrical Details
E1.3 Electrical Details
E2.1 Electrical Roof Plan
E2.2 Electrical Site Plan
E3.1 Unit A - First Floor Rough-In Plan
E3.2 Unit A - Second Floor Rough-In Plan
E3.3 Unit B - First and Second Floor Rough-In Plans
E3.4 Unit C - Lower Level Rough-In Plan / Unit C - First Floor Rough-In Plan
E3.5 Rough-In Details
E4.1 Unit A - First Floor Lighting Plan
E4.2 Unit A - Second Floor Lighting Plan
E4.3 Unit A - Equipment Platform Lighting Plan
E4.4 Unit B - First Floor Lighting Plan
E4.5 Unit B - Second Floor Lighting Plan
E4.6 Unit C - Lower Level Lighting Plan
E4.7 Unit C - First Floor Lighting Plan
E5.1 Unit A - First Floor Power Plan
E5.2 Unit A - Second Floor Power Plan
E5.3 Unit A - Equipment Platform Power Plan
E5.4 Unit B - First Floor Power Plan
E5.5 Unit B - Second Floor Power Plans
E5.6 Unit C - Lower Level Power Plan
E5.7 Unit C - First Floor Power Plan
E6.1 Unit A - First Floor Fire Alarm Plan
E6.2 Unit A - Second Floor Fire Alarm Plan
E6.3 Unit A - Equipment Platform Fire Alarm Plan
E6.4 Unit B - First Floor Fire Alarm Plan
E6.5 Unit B - Second Floor Fire Alarm Plan
E6.6 Unit C - Lower Level Fire Alarm Plan
E6.7 Unit C - First Floor Fire Alarm Plan
E7.1 Single-Line Diagram
E7.2 Power Calculations
E8.1 Light Fixture and Panelboard Schedules
E8.2 Panelboard Schedules
T1.1 Technology Details
T1.2 Technology Details
T3.1 Unit A - First Floor Technology Plan
T3.2 Unit A - Second Floor & Equipment Platform Technology Plans
T3.3 Unit B - First and Second Floor Technology Plans
T3.4 Unit C - Lower Level Technology Plan / Unit C - First Floor Technology Plan
T4.1 Overall Technology Plan - First Floor
T4.2 Overall Technology Plan - Second Floor