Highline School District - Pacific Middle School Replacement: MACC 2 Early Bid Packages, Des Moines, WA - Bid Package 08D - Aluminum, Glass & Glazing    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 314 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Content Index
Page 4 Section 00020 Instructions to Bidders
Page 10 Bid Form
Page 14 Exhibit A Scope of Work / Supply and Clarifications / Qualifications
Page 20 Exhibit A.2 Scope Allocations (Under Separate Cover)
Page 21 Exhibit B Drawings, Specifications, Addenda and Reference Documents
Page 22 Exhibit C Alternates, Unit Prices, and Labor Rates
Page 27 Exhibit D Project Schedule / Milestones
Page 28 Exhibit D.1 Schedule
Page 57 Exhibit E Standard Subcontract Terms and Conditions
Page 76 Exhibit F Supplier Code of Conduct
Page 85 Exhibit G Standard Insurance Requirements
Page 96 Exhibit H Interim Estimate for Payment, Waiver and Release
Page 98 Exhibit I Final Estimate for Payment, Unconditional Waiver and Release
Page 101 Exhibit J Standard Subcontractor Environmental Health and Safety Requirements
Page 105 Exhibit K Standard Change Order
Page 107 Exhibit M Project Specific Requirements
Page 121 Exhibit N Supplemental Terms and Conditions to Subcontract for Use in the State of Washington
Page 129 Exhibit O Performance Bond
Page 131 Payment Bond
Page 133 Exhibit PS-1 Owner / Contractor Agreement
Page 134 AIA Document A133-2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor
Page 173 AIA Document A133-2019 Exhibit A Guaranteed Maximum Price Amendment
Page 177 Exhibit B: Cost Responsibility Matrix
Page 180 AIA Document A201-2017 General Conditions of the Contract for Construction
Page 257 Exhibit PS-2 Environmental Health and Safety Plan Updates
Page 258 Exhibit PS-6 COVID-19 On-Site Work Requirements
Page 260 Exhibit Q Standard Environmental Insurance Requirements
Page 262 Exhibit R Quality Management Program
Page 266 Exhibit S Authorized Signatories
Page 267 Exhibit T1 Supplier Diversity Program Summary
Page 269 Exhibit T2 Instructions to Bidders
Page 270 Exhibit T3 Diverse Business Status Verification
Page 273 Exhibit U Sub-Subcontractor Identification
Page 275 Exhibit X Site Requirements
Page 288 Exhibit X.1 Site and Demolition Logistics Plan
Page 297 Exhibit X.2 Paving Plan
Page 299 Exhibit X.3 Temp Power and Lighting
Page 303 Exhibit X.4 Temp Heat Plan (Under Separate Cover)
Page 304 Exhibit X.5 Temp Garage Door Plan
Page 308 Exhibit X.6 Delivery Request Form
Page 310 Exhibit X.7 PlanIt for Construction Work Plan Development