This document has 341 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Table of Contents
Page 4 Section 230000 Heating, Ventilating & Air Conditioning (HVAC) Basis Requirements
Page 14 Section 230519 Meters & Gauges for HVAC Piping
Page 19 Section 230523 General-Duty Valves for HVAC Piping
Page 24 Section 230553 Identification for HVAC Piping, Ductwork & Equipment
Page 28 Section 232113 HVAC Piping
Page 33 Section 232113.33 Ground-Loop Heat-Pump Piping
Page 46 Section 232116 Hydronic Piping Specialties
Page 48 Section 232500 HVAC Water Treatment
Page 53 Section 260000 Electrical Basic Requirements
Page 63 Section 260533 Raceways
Page 70 Section 260543 Electrical Vaults & Underground Raceways
Page 78 Division 01 General Requirements
Page 79 Section 011100 Summary of Work
Page 85 Section 012300 Alternates
Page 86 Section 012500 Substitutions
Page 90 Section 012600 Contract Modifications
Page 94 Section 012976 Progress Payments
Page 106 Section 013100 Project Management Coordination
Page 115 Section 013119 Project Meetings
Page 122 Section 013216 Construction Schedule
Page 130 Section 013300 Submittal Procedures
Page 138 Section 013523 Safety Requirements
Page 147 Section 014100 Air Barrier System
Page 154 Section 014200 References
Page 158 Section 014500 Contractor Quality Control
Page 161 Section 014523 Testing & Inspection
Page 166 Section 014554 Air Barrier Testing & Air Leak Mitigation
Page 172 Section 015000 Temporary Facilities & Controls
Page 187 Section 015639 Temporary Tree Protection Plan
Page 191 Section 015800 Project Identification
Page 193 Section 017123 Field Engineering
Page 196 Section 017300 Execution
Page 206 Section 017339 Cutting & Patching
Page 209 Section 017400 Construction Waste Management
Page 214 Section 017500 Test Engineer Services
Page 220 Section 017700 Closeout Procedures
Page 230 Section 017823 Operation & Maintenance Data
Page 236 Section 017836 Warranties
Page 239 Section 017900 Demonstration & Training
Page 243 Section 019100 Commissioning
Page 251 Appendix A Divisions 00 & 01 Forms
Page 252 Table of Contents
Page 254 Substitution Request Form
Page 255 Proposal Request
Page 256 Contract Change Order
Page 257 PR / COP Breakdown Summary GC / CM
Page 258 PR / COP Subcontractor Breakdown Summary GCCM
Page 259 PR Cost Breakdown
Page 261 PR Wage Rates
Page 262 PR Equipment Rates
Page 263 Construction Change Directive
Page 264 Application & Certificate for Payment
Page 266 Monthly Subcontractors List & Certifications
Page 267 Statement of Intent to Pay Prevailing Wages & Affidavit of Wages Paid Information
Page 268 Physical Completion of Public Works Project
Page 269 Certificate of Payment of Labor & Materials
Page 270 Request for Information
Page 271 Notice on Non-Compliance
Page 272 Short Interval Schedule
Page 273 Building Model Use Agreement
Page 274 Delivery of CAD Files
Page 275 Contractor Quality Control Daily Report
Page 277 Utility Shutdown Request
Page 278 Sample Project Identification Sign
Page 279 Section 071900 Water Repellents
Page 284 Section 079200 Joint Sealants
Page 290 Section 311000 Site Clearing
Page 296 Section 312000 Earth Moving
Page 304 Section 312319 Dewatering
Page 308 Section 312500 Erosion & Sediment Control
Page 316 Section 328400 Temporary Irrigation (Design Build)
Page 320 Section 329113 Soil Preparation
Page 328 Section 329300 Plants
Page 340 Section 334116 Subdrainage Piping