Renton High School Replacement - MACC 01, Renton, WA - Addendum #2    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 121 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 RHS MACC 1.0 Addendum 2
Page 3 Invitation to Bid
Page 5 Section 00020 Instructions to Bidders
Page 11 Exhibit D Project Schedule / Milestones
Page 13 Exhibit D BP21A - Project Schedule / Milestones
Page 15 Project Schedule
Page 18 Bidder Questions
Page 20 Addendum Number Two
Page 30 Section 000110 Table of Contents
Page 34 Section 013119 Project Meetings
Page 36 Section 014200 References
Page 39 Section 015000 Temporary Facilities and Controls
Page 45 Appendix C Archaeological Monitoring Support Requirements During Ground Disturbance
Page 48 Appendix D Draft - Archaeological Monitoring and Inadvertent Discovery Plan
Page 77 Section 017419 Construction Waste Management and Disposal
Page 79 Section 031000 Concrete Forming and Accessories
Page 84 Section 033000 Cast-In-Place Concrete
Page 93 Section 311000 Site Clearing and Site Demolition
Page 101 Section 312000 Earth Moving
Page 114 Section 323300 Site Furnishings
Page 119 Section 329310 Salvaged Logs