Renton High School Replacement - MACC 01, Renton, WA - Phase 1 Bid Set Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 696 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Section 000107 Seals Page
Page 5 Section 000110 Table of Contents
Page 9 Section 007300 Supplementary Conditions
Page 11 Confirmation of Background Check Form
Page 13 Section 007330 Non-Discriminatory Policy
Page 15 Non-Discrimination Policy Statement
Page 17 Section 007339.1 Inclusion Plan
Page 19 Inclusion Plan
Page 23 Section 007343.1 Prevailing Wage Rate Requirements
Page 25 Truck Routes
Page 27 Section 012500 Substitution Procedures
Page 29 Substitution Request Form
Page 31 Section 012600 Contract Modification Procedures
Page 35 Change in the Work Cost Summary
Page 37 Request for Interpretation
Page 39 Order for a Minor Change in the Work
Page 41 Construction Change Directive
Page 43 Change Order Request
Page 45 Change Order
Page 47 Section 012900 Payment Procedures
Page 49 Section 013119 Project Meetings
Page 51 Section 014000 Quality Requirements
Page 57 Section 014100 Regulatory Requirements
Page 59 Section 014200 References
Page 63 Section 014516.1 Field Engineering
Page 65 Section 014516.13 Contractor Quality Control
Page 67 Notice of Non-Compliance Form
Page 69 Section 015639 Temporary Tree & Plant Protection
Page 75 Section 016000 Product Requirements
Page 77 Section 017300 Execution
Page 81 Section 017400 Cleaning & Waste Management
Page 83 Section 017419 Construction Waste Management & Disposal
Page 85 Building or Remodeling in King County
Page 86 Construction & Demolition (C&D) Recycling & Disposal Facilities
Page 87 Construction & Demolition Waste Acknowledgement Form
Page 89 Construction & Demolition Waste Diversion Form
Page 91 Section 017700 Closeout Procedures
Page 95 Certificate of Substantial Completion
Page 97 Contractor's Affidavit of Payment of Debts & Claims
Page 99 Consent of Surety to Final Payment
Page 101 Subcontractor's Affidavit of Payment for Labor & Materials & Final Release & Indemnity Agreement
Page 105 Substantial Completion Checklist
Page 107 Final Completion Checklist
Page 109 Section 017823 Operation & Maintenance Data
Page 111 Section 017836 Warranties
Page 113 Section 017839 Project Record Documents
Page 115 Section 017900 Demonstration & Training
Page 117 Section 018113 Sustainability Requirements
Page 125 Material Sustainability Chart
Page 131 WSSP 2023 Scorecard
Page 135 Section 018316 Exterior Enclosure Performance Requirements
Page 139 Section 024100 Demolition
Page 142 Section 031000 Concrete Forming & Accessories
Page 148 Section 032000 Concrete Reinforcing
Page 150 Section 033000 Cast-In-Place Concrete
Page 160 Section 042000 Unit Masonry
Page 168 Section 072500 Weather Barriers
Page 175 Section 076200 Sheet Metal Flashing & Trim
Page 184 Section 099113 Exterior Painting
Page 194 Section 220010 General Plumbing Provisions
Page 196 Section 220523 General-Duty Valves for Plumbing Piping
Page 200 Section 220529 Hangers & Supports for Plumbing Piping & Equipment
Page 208 Section 220548 Vibration & Seismic Controls for Plumbing Piping & Equipment
Page 214 Section 220719 Plumbing Piping Insulation
Page 220 Section 221116 Domestic Water Piping
Page 228 Section 221119 Domestic Water Piping Specialties
Page 230 Section 221316 Sanitary Waste & Vent Piping
Page 236 Section 230010 General HVAC Provisions
Page 244 Section 238239 Unit Heaters
Page 246 Section 260000 Electrical General Conditions
Page 258 Section 260005 Electrical - Existing Systems
Page 260 Section 260010 Excavation & Backfill for Electrical Underground Utilities
Page 264 Section 260519 Wires & Cables
Page 268 Section 260526 Grounding
Page 272 Section 260532 Outlet & Pull Boxes
Page 276 Section 260533 Raceway
Page 280 Section 260534 Metal Clad Cable (Type MC) & Fittings
Page 284 Section 262419 Motor Controllers
Page 288 Section 262726 Switches & Receptacles
Page 292 Section 265000 Lighting
Page 296 Section 270000 Low Voltage General Requirements
Page 326 Section 270528 Pathways for Communications Systems
Page 334 Section 272000 Data & Voice Infrastructure
Page 358 Section 282300 Closed Circuit Television System (CCTV)
Page 366 Section 311000 Site Clearing & Site Demolition
Page 373 Fill Source Statement
Page 376 Section 312000 Earth Moving
Page 390 Section 312513 Erosion Control
Page 397 Example Construction SWPPP
Page 487 Section 321216 Asphalt Paving
Page 495 Section 321313 Concrete Paving
Page 505 Section 321316 Decorative Concrete Paving
Page 515 Section 323300 Site Furnishings
Page 519 Section 328400 Irrigation
Page 537 Section 329113 Soil Preparation
Page 545 Section 329200 Turf & Grasses
Page 555 Section 329300 Plants
Page 567 Section 331100 Facility Water Distribution Piping
Page 577 Section 333000 Facility Sanitary Sewers
Page 583 Section 334100 Storm Utility Drainage Piping
Page 593 Appendix A Geological Report