Sumner High School Addition Phase 2 - MACC 2, Sumner, WA - Energy Management & Controls As-Built Plans
Sheet 1 Energy Management & Controls As-Built Plans
Coversheet
Sheet 1
NET-1 MSTP Installation Reference
NET-2 SNE Installation Reference
NET-3 SNE Network Diagram
NET-4 Network Riser - 1
NET-5 Network Riser - 2
NET-6 Network Riser - 3
NET-7 Network Riser - 4
M5.61 First Floor Mechanical Piping Plan - Area 1
M5.62 First Floor Mechanical Piping Plan - Area 2
M5.71 Second Floor Mechanical Piping Plan - Area 1
M5.72 Second Floor Mechanical Piping Plan - Area 2
M5.81 Third Floor Mechanical Piping Plan - Area 1
M5.90 Penthouse Mechanical Piping Plan
CHWS-1 CHWS Flow Layout
CHWS-2 CHWS Bill of Material
CHWS-3 CHWS Sequence of Operation
CHWS-4 CHWS Point Schedule
CHWS-5 CHWS Wiring Details
CHWS-6 CHWS Controller Wiring Details
CHWS-7 CHWS Controller Wiring Details
CHWS-8 CHWS Controller Wiring Details
HWS-1 HWS Flow Layout
HWS-2 HWS Sequence of Operation
HWS-3 HWS Point Schedule
HWS-4 HWS Wiring Details
HWS-5 HWS Controller Wiring Details
HWS-6 HWS Controller Wiring Details
AHU-1 AHU-1 Flow Layout
AHU-2 AHU-1 Sequence of Operation
AHU-3 AHU-1 Point Schedule
AHU-4 AHU-1 Wiring Details
AHU-5 AHU-1 Point Schedule
AHU-6 AHU-1 Point Schedule
AHU-7 AHU-2 Flow Layout
AHU-8 AHU-2 Sequence of Operation
AHU-9 AHU-2 Point Schedule
AHU-10 AHU-2 Wiring Details
AHU-11 AHU-2 Controller Wiring Details
DOAS-1 Induction System Heat Recovery Unit (DOAU) - Flow Layout
DOAS-2 Induction System Heat Recovery Unit (DOAU) - Sequence of Operation
DOAS-3 Induction System Heat Recovery Unit (DOAU) - Point Schedule
DOAS-4 Induction System Heat Recovery Unit (DOAU) - Wiring Details
DOAS-5 Induction System Heat Recovery Unit (DOAU) - Controller Wiring Details
DOAS-6 Induction System Heat Recovery Unit (DOAU) - Controller Wiring Details
DAOS-7 DOAU-4 Flow Layout
DAOS-8 DOAU-4 Sequence of Operation
DAOS-9 DOAU-4 Point Schedule
DAOS-10 DOAU-4 Wiring Details
DOAS-11 DOAU-4 Controller Wiring Details
DOAS-12 DOAU-4 Controller Wiring Details
HRU-1 HRU-1 Flow Layout
HRU-2 HRU-1 Sequence of Operation
HRU-3 HRU-1 Sequence of Operation
HRU-4 HRU-1 Point Schedule
HRU-5 HRU-1 Wiring Details
HRU-6 HRU-1 Controller Wiring Details
HRU-7 HRU-1 Controller Wiring Details
HRU-8 HRU-1 Controller Wiring Details
VAV-1 SVAV Flow Layout
VAV-2 SVA Schedule
VAV-3 EVAV Flow Layout
VAV-4 EVAV w RM-SP Flow Layout
VAV-5 EVAV w RM-SP Schedule
VAV-6 EVAV w RM-SP & Purge SW Flow Layout
VAV-7 SVAV w EVAV Flow Layout
VAV-6 VAV Power Schedule
VAV-7 Fume Hood Exhaust Valve Flow Layout
ITU-1 Induction Terminal Unit Flow Layout
ITU-2 Induction Terminal Unit Schedule
ITU-3 Induction Terminal Unit Schedule
ITU-4 Level - 1 CGM-1 ITU Point Schedule
ITU-5 Level - 1 CGM-1 ITU Controller Wiring Details
ITU-6 Level - 1 CGM-1 ITU Controller Wiring Details
ITU-5 Level - 1 CGM-2 ITU Point Schedule
ITU-8 Level - 1 CGM-2 ITU Controller Wiring Details
ITU-9 Level - 1 CGM-3 ITU Point Schedule
ITU-10 Level - 1 CGM-3 ITU Controller Wiring Details
ITU-11 Level - 1 CGM-3 ITU Controller Wiring Details
ITU-12 Level - 1 CGM-4 ITU Point Schedule
ITU-13 Level - 1 CGM-4 Controller Wiring Details
ITU-14 Level - 1 CGM-4 Controller Wiring Details
ITU-15 Level - 1 CGM-5 ITU Point Schedule
ITU-16 Level - 1 CGM-5 Controller Wiring Details
ITU-17 Level - 1 CGM-5 Controller Wiring Details
ITU-21 CP1-ITU-Level - 1 Panel Layout
ITU-19 Level - 2 CGM-1 ITU Point Schedule
ITU-20 Level - 2 CGM-1 Controller Wiring Details
ITU-21 Level - 2 CGM-1 Controller Wiring Details
ITU-22 Level - 2 CGM-2 ITU Point Schedule
ITU-25 Level - 2 CGM-3 ITU Point Schedule
ITU-26 Level - 2 CGM-3 Controller Wiring Details
ITU-27 Level - 2 CGM-3 Controller Wiring Details
ITU-28 CP1-ITU-Level - 2 Panel Layout
ITU-29 Level - 3 CGM-1 ITU Point Schedule
ITU-30 Level - 3 CGM-1 Controller Wiring Details
ITU-31 Level - 3 CGM-1 Controller Wiring Details
ITU-32 Level - 3 CGM-2 ITU Point Schedule
ITU-33 Level - 3 CGM-2 Controller Wiring Details
ITU-34 Level - 3 CGM-2 Controller Wiring Details
ITU-35 Level - 3 CGM-3 ITU Point Schedule
ITU-36 Level - 3 CGM-3 Controller Wiring Details
ITU-37 Level - 3 CGM-3 Controller Wiring Details
ITU-38 Level - 3 CGM-4 ITU Point Schedule
ITU-39 Level - 3 CGM-4 Controller Wiring Details
ITU-40 Level - 3 CGM-3 Controller Wiring Details
ITU-41 CP1-ITU-Level - 3 Panel Layout
ITU-42 ITU Wiring Details
SPLIT-1 Split System
EF-1 Ceiling Fan Flow Layout
EF-2 Exhaust Fan Flow Layout
EF-3 Fume Hood Exhaust Fan Flow Layout
MISC-1 Fume Hood Exhaust Flow Layout
MISC-2 Elevator Sump Pump Flow Layout
M-SC-3 Gas Water Heater Flow Layout
RS-1 Room Schedule
RS-1 Room Schedule
VS-1 Valve Schedule