A0.0.V2 Cover Sheet
A0.1 Data Sheet
M1.01 Mechanical Legend & Schedules
M1.02 Mechanical Schedules
M1.03 Mechanical Schedules
M1.04 Mechanical Schedules
M1.05 Mechanical Schedules
M3.01 Foundation Plumbing Plan - Area 1
M3.02 Foundation Plumbing Plan - Area 2
M3.11 First Floor Plumbing Plan - Area 1
M3.12 First Floor Plumbing Plan - Area 2
M3.21 Second Floor Plumbing Plan - Area 1
M3.22 Second Floor Plumbing Plan - Area 2
M3.31 Third Floor Plumbing Plan - Area 1
M3.40 Penthouse Plumbing Plan
M4.11 First Floor Mechanical Reflected Ceiling Plan - Area 1
M4.12 First Floor Mechanical Reflected Ceiling Plan - Area 2
M4.21 Second Floor Mechanical Reflected Ceiling Plan - Area 1
M4.22 Second Floor Mechanical Reflected Ceiling Plan - Area 2
M4.31 Third Floor Mechanical Reflected Ceiling Plan - Area 1
M5.11 First Floor Mechanical Plan - Area 1
M5.12 First Floor Mechanical Plan - Area 2
M5.21 Second Floor Mechanical Plan - Area 1
M5.22 Second Floor Mechanical Plan - Area 2
M5.31 Third Floor Mechanical Plan - Area 1
M5.40 Penthouse Mechanical Plan
M5.50 Rooftop Mechanical Plan - Overall
M5.61 First Floor Mechanical Piping Plan - Area 1
M5.62 First Floor Mechanical Piping Plan - Area 2
M5.71 Second Floor Mechanical Piping Plan - Area 1
M5.72 Second Floor Mechanical Piping Plan - Area 2
M5.81 Third Floor Mechanical Piping Plan - Area 1
M5.90 Penthouse Mechanical Piping Plan
M6.01 Enlarged Plumbing Plans
M6.02 Enlarged Plumbing Plans
M6.03 Enlarged Plumbing Plans
M6.04 Enlarged Mechanical Sections
M7.01 Mechanical Details
M7.02 Mechanical Details
M7.03 Mechanical Details
M7.04 Mechanical Details
M7.05 Mechanical Details
M7.06 Mechanical Details
M7.07 Mechanical Details
M7.08 Mechanical Details
M7.09 Mechanical Details
M7.10 Mechanical Details
M8.01 Mechanical Controls
M8.02 Mechanical Controls
M8.03 Mechanical Controls
M8.04 Mechanical Controls
M8.05 Mechanical Controls
M8.06 Mechanical Controls
E0.01 Electrical Legend
E0.02 Systems Legend
E0.10 Light Fixture Schedules
E0.11 Lighting Control Sequence
E0.12 Lighting Control Schedules
E0.13 Lighting Control Schedules
E0.20 Mechanical Electrical Equipment Connection Schedules
E1.00A Electrical Site Plan - West
E1.00B Electrical Site Plan - East
E1.01A Electrical Site Lighting Plan - Phase 1
E2.11 First Floor Lighting Plan - Area 1
E2.12 First Floor Lighting Plan - Area 2
E2.21 Second Floor Lighting Plan - Area 1
E2.22 Second Floor Lighting Plan - Area 2
E2.31 Third Floor Lighting Plan - Area 1
E2.40 Penthouse Lighting Plan
E3.11 First Floor Power Plan - Area 1
E3.12 First Floor Power Plan - Area 2
E3.21 Second Floor Power Plan - Area 1
E3.22 Second Floor Power Plan - Area 2
E3.31 Third Floor Power Plan - Area 1
E3.40 Penthouse Power Plan
E3.50 Electrical Roof Plan
E4.01 First & Second Floor Systems Conduit Plan - Overall
E4.02 Third Floor & Penthouse Systems Conduit Plan - Overall
E4.11 First Floor Systems Plan - Area 1
E4.12 First Floor Systems Plan - Area 2
E4.21 Second Floor Systems Plan - Area 1
E4.22 Second Floor Systems Plan - Area 2
E4.31 Third Floor Systems Plan - Area 1
E4.40 Penthouse Systems Plan
E5.01 Enlarged Power Plan
E5.02 Kitchen Equipment Schedule
E5.03 Enlarged Elevations
E5.11 Enlarged Systems Plans
E6.00 Electrical One-Line Diagram
E6.01 Electrical One-Line Diagram
E6.02 Electrical One-Line Diagram
E6.10 Electrical Panel Schedules
E6.11 Electrical Panel Schedules
E6.12 Electrical Panel Schedules
E6.13 Electrical Panel Schedules
E6.14 Electrical Panel Schedules
E6.15 Electrical Panel Schedules
E6.16 Electrical Panel Schedules
E7.00 Electrical Details
E7.01 Electrical Details
E7.02 Electrical Details
E7.03 Electrical Details
E7.04 Electrical Lighting Control Details
E7.05 Electrical Lighting Control Details
E7.06 Electrical Lighting Control Details
E7.11 Telecom Details
E7.12 Telecom Details
E7.13 A/V Details
E7.14 A/V Details
E7.15 IP Intercom / Clock Details
E7.16 Access Control Details
E7.17 CCTV Details
E7.18 CCTV Details
FA0.01 Fire Alarm / Emergency Communication System - Legend & Notes
FA0.02 Fire Alarm / Emergency Communication System - Riser Diagram & Notes
FA0.03 Fire Alarm / Emergency Communication System - Sequence of Operations
FA2.11 Fire Alarm / Emergency Communication System - First Floor Plan - Area 1
FA2.12 Fire Alarm / Emergency Communication System - First Floor Plan - Area 2
FA2.21 Fire Alarm / Emergency Communication System - Second Floor Plan - Area 1
FA2.22 Fire Alarm / Emergency Communication System - Second Floor Plan - Area 2
FA2.31 Fire Alarm / Emergency Communication System - Third Floor Plan - Area 1
FA2.40 Fire Alarm / Emergency Communication System - Penthouse Plan
FA2.51 Fire Alarm / Emergency Communication System - Roof Plan - Area 1
FA2.52 Fire Alarm / Emergency Communication System - Roof Plan - Area 2
FX101 Fire Protection General Notes & Riser Detail