New Middle School at Former Alderwood Middle School, Edmonds School District, Lynnwood, WA - Volume 1A Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 1186 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Section 000103 Project Directory
Page 5 Section 000110 Table of Contents
Page 15 Section 001116 Invitation to Bidders
Page 18 Section 002113 Instructions to Bidders
Page 25 Section 002205 GC/CM Process
Page 39 Section 002217 Safety
Page 41 Section 002410 General Scope of Work
Page 50 Section 002413 Specific Scope of Work by Bid Package
Page 76 Bid Package Responsibility Matrix
Page 84 Section 003100 Available Project Information
Page 85 Subsurface Exploration, Infiltration Feasibility, Geologic Hazard & Geotechnical Engineering Report
Page 211 Critical Aquifer Recharge Area Report
Page 242 Arborist Report
Page 263 Revised Critical Areas Report
Page 423 Buffer Mitigation Plan
Page 439 Baseline Regulated Building Material Survey Report
Page 837 Project Design Regulated Building Material Survey Report
Page 876 Section 003113 Schedule
Page 879 Section 004113 Bid Form
Page 883 Section 004115 Subcontractor Listing Form
Page 884 Section 004323 Schedule of Bid Alternates
Page 886 Section 005213 Form of Contract
Page 887 Standard Subcontract
Page 905 Subcontract Performance Bond
Page 908 Subcontractor Payment Bond
Page 910 AIA Document A133-2019 Standard Form of Agreement Between Owner & Construction Manager as Constructor
Page 954 Section 007200 General Conditions
Page 955 AIA Document A201-2017 General Conditions of the Contract for Construction
Page 1030 Attachment 1 Intentionally Omitted
Page 1031 Attachment 2 Intentionally Omitted
Page 1032 Attachment 3 Construction Manager's Preconstruction Services Proposal
Page 1033 Section 007343 Wage Rates Requirements
Page 1035 Section 009900 Prevailing Wage Rates
Page 1036 Section 011000 Summary
Page 1040 Section 011110 Summary of Hazardous Materials
Page 1044 Section 012000 Price & Payment Procedures
Page 1047 Section 012200 Unit Prices
Page 1050 Section 012300 Alternates
Page 1052 Section 012500 Substitution Procedures
Page 1056 Substitution Request Form - Pre Bid
Page 1057 Substitution Request Form - Post Bid
Page 1058 Section 013000 Administrative Requirements
Page 1074 Section 013216 Construction Progress Schedule
Page 1077 Section 014000 Quality Requirements
Page 1081 Section 014010 The Air Barrier System
Page 1087 Section 014013 Freestanding Mockup
Page 1090 Section 014533 Code-Required Special Inspections & Procedures
Page 1099 Section 015000 Temporary Facilities & Controls
Page 1102 Section 015639 Tree Protection
Page 1114 Tree Protection Area Entrance Prohibited
Page 1115 Section 015713 Temporary Erosion & Sediment Control
Page 1123 Section 016000 Product Requirements
Page 1131 Section 016011 Seismic Anchoring Requirements
Page 1135 Section 016116 Volatile Organic Compound (VOC) Restrictions
Page 1138 Section 016211 Delegated Design
Page 1142 Section 017000 Execution & Closeout Requirements
Page 1149 Section 017419 Construction Waste Management & Disposal
Page 1154 Section 017800 Closeout Submittals
Page 1158 Section 017900 Demonstration & Training
Page 1161 Section 018113 Sustainable Design Requirements (WSSP)
Page 1167 Section 018301 Leakage Testing for Building Envelopes
Page 1170 Section 019113 General Commissioning Requirements
Page 1180 Section 019114 Commissioning Authority Responsibilities