Aspen Court Hotel Conversion, Tacoma, WA - Addendum #1 Outline Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 75 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 General Information
Page 3 Table of Contents
Page 6 Division 00 Bidding Requirements and Conditions of the Contract
Page 7 Division 01 General Requirements
Page 10 Substitution Request Form
Page 15 Division 02 Existing Conditions
Page 17 Division 03 Concrete
Page 27 Division 04 Masonry
Page 29 Division 07 Thermal and Moisture Protection
Page 32 Division 08 Doors and Windows
Page 35 Division 09 Finishes
Page 47 Division 10 Specialties
Page 49 Division 11 Equipment
Page 50 Division 12 Furnishings
Page 51 Divisions 21-28 Shall be Design-Build and Coordinated by the Contractor
Page 52 Division 22 Plumbing
Page 54 Division 23 Heating, Ventilation, and Air Conditioning (HVAC)
Page 55 Division 26 Electrical
Page 58 Division 31 Site and Earthwork
Page 66 Division 32 Exterior Improvements
Page 74 Division 33 Utilities
Page 75 Appendices A-G