Printable Drawing List

Port Angeles Middle School Modernization and Addition - All Remaining Bid Packages, Port Angeles, WA - 100% CD GMP - Bid Set Plans Volume 2

Cover Sheet
G001 Index, Vicinity Map, Legal Description
A001 General Architectural Notes
A010 Interior Assemblies
A011 Exterior Wall Assemblies
A012 Exterior Wall Assemblies
A013 Horizontal Assemblies
A101 Level 1 Floor Plan - Overall
A101A Level 1 - Floor Plan Area A
A101B Level 1 - Floor Plan Area B
A102 Level 2 Floor Plan - Overall
A102A Level 2 - Floor Plan Area A
A102B Level 2 - Floor Plan Area B
A102C Level 1 - Floor Plan Area C
A103 Level 3 Floor Plan - Overall
A103A Level 3 - Floor Plan Area A
A103B Level 3 - Floor Plan Area B
A120 Roof Plan - Overall
A120A Roof Plan - Area A
A120B Roof Plan - Area B
A120C Roof Plan - Area C
A131 Level 1 Reflected Ceiling Plan - Overall
A131A Level 1 Reflected Ceiling Plan - Area A
A131B Level 1 Reflected Ceiling Plan - Area B
A132 Level 2 Reflected Ceiling Plan - Overall
A132A Level 2 Reflected Ceiling Plan - Area A
A132B Level 2 Reflected Ceiling Plan - Area B
A132C Level 1 Reflected Ceiling Plan - Area C
A133 Level 3 Reflected Ceiling Plan - Overall
A133A Level 3 Reflected Ceiling Plan - Area A
A133B Level 3 Reflected Ceiling Plan - Area B
A141 Striping Plans - Main Gym
A142 Striping Plans - Aux Gym
A201 Exterior Elevations - Overall
A202 Exterior Elevations - Gym
A210 Exterior Elevations
A211 Exterior Elevations
A301 Overall Building Sections
A302 Building Sections
A303 Building Sections
A304 Building Sections - Gym
A311 Wall Sections
A312 Wall Sections
A313 Wall Sections
A314 Wall Sections
A315 Wall Sections
A316 Wall Sections
A317 Wall Sections
A318 Wall Sections - Gym
A319 Wall Sections - Gym
A320 Wall Sections - Gym
A351 Details - Foundation
A352 Details - Foundation
A353 Details - Exterior Wall
A354 Details - Exterior Wall
A361 Entry Canopy
A362 Building Canopies
A363 Front Canopy
A364 Alternate 8 East Gym Canopies
A365 Details - Entry Canopy
A366 Details - Entry Canopy
A367 Details - Building Canopies
A368 Details - Front Canopy
A371 Details - Parapet
A372 Details - Roof
A373 Details - Roof
A374 Details - Gym Roof
A375 Details - Gym Roof
A376 Details - Gym Roof
A381 Details - Seismic Joint
A382 Details - Seismic Joint
A383 Details - Seismic Joint
A400 General Interior Notes, Schedules & Legends
A401A Level 1 - Finish Plan Area A
A401B Level 1 - Finish Plan Area B
A402A Level 2 - Finish Plan Area A
A402B Level 2 - Finish Plan Area B
A402C Level 1 - Finish Plan Area C
A403A Level 3 - Finish Plan Area A
A403B Level 3 - Finish Plan Area B
A411 Enlarged Floor Plans - Toilet Rooms
A412 Enlarged Floor Plans - Toilet Rooms
A413 Enlarged Floor Plans - Toilet Rooms
A414 Enlarged Floor Plans - Locker Rooms
A415 Enlarged Floor Plans - Locker Rooms
A416 Enlarged Floor Plans - Locker Rooms
A417 Enlarged Floor Plans - Locker Rooms
A451 Interior Elevations - Public Spaces
A452 Interior Elevations - Public Spaces
A453 Interior Elevations - Public Spaces
A454 Interior Elevations - Public Spaces
A455 Interior Elevations - Public Spaces
A456 Interior Elevations - Corridors
A457 Interior Elevations - Corridors
A458 Interior Elevations - Corridors
A459 Interior Elevations - Corridors
A460 Interior Elevations - Learning Spaces
A461 Interior Elevations - Learning Spaces
A462 Interior Elevations - Learning Spaces
A463 Interior Elevations - Learning Spaces
A464 Interior Elevations - Learning Spaces
A465 Interior Elevations - Learning Spaces
A466 Interior Elevations - Learning Spaces
A467 Interior Elevations - Admin Spaces
A468 Interior Elevations - Kitchen and Storage
A471 Details - Interior Floor / Wall
A472 Details - Interior Wall
A473 Details - Interior
A474 Details - Interior Floor
A481 Details - Ceiling
A491 Details - Casework
A492 Details - Casework
A493 Enlarged Casework Plan and Elevations
A494 Enlarged Casework Plan and Elevations
A495 Enlarged Casework Plan and Elevations
A501 Enlarged Stair Plans & Sections
A502 Enlarged Stair Plans & Sections
A503 Enlarged Stair Plans & Sections
A504 Enlarged Stair Plans & Sections
A505 Enlarged Stair Plans & Sections
A506 Enlarged Elevator Plans & Sections
A511 Details - Stairs & Railings
A512 Details - Stairs & Railings
A600 Door and Frame Types
A601 Door Schedule
A611 Details - Interior Door & Relite
A612 Details - Exterior Door
A621 Storefront, Relite & Window & Louver Types
A622 Curtain Wall Types
A631 Details - Storefront
A632 Details - Curtain Wall
A633 Details - Curtain Wall
A634 Details - Window
A635 Details - Louver
A701 Signage Schedule
A711 Signage Types
A712 Signage Types
P001 Plumbing Legend & General Notes
P002 Plumbing Site Plan
P100A Foundation - Plumbing Plan - Area A
P100B Foundation - Plumbing Plan - Area B
P100C Foundation - Plumbing Plan - Area C
P101A Level 1 - Plumbing Plan - Area A
P101B Level 1 - Plumbing Plan - Area B
P102A Level 2 - Plumbing Plan - Area A
P102B Level 2 - Plumbing Plan - Area B
P102C Level 2 - Plumbing Plan - Area C
P103A Level 3 - Plumbing Plan - Area A
P103B Level 3 - Plumbing Plan - Area B
P201A Plumbing Roof Plan - Area A
P201B Plumbing Roof Plan - Area B
P201C Plumbing Roof Plan - Area C
P401 Plumbing Enlarged Plans
P402 Plumbing Enlarged Plans
P403 Plumbing Enlarged Plans
P501 Plumbing Details
P502 Plumbing Details
P503 Plumbing Details
P504 Piping Structure Installation Details
P601 Plumbing Schedules
FA001 Fire Alarm / Emergency Communication System Legend and Notes
FA002 Fire Alarm / Emergency Communication System Riser Diagram
FA003 Fire Alarm / Emergency Communication System Sequence of Operations
FA201A Level 1 Fire Alarm / Emergency Communication System - Area A
FA201B Level 1 Fire Alarm / Emergency Communication System - Area B
FA202A Level 2 Fire Alarm / Emergency Communication System - Area A
FA202B Level 2 Fire Alarm / Emergency Communication System - Area B
FA202C Level 2 Fire Alarm / Emergency Communication System - Area C
FA202D Level 2 Fire Alarm / Emergency Communication System - Area D
FA203A Level 3 Fire Alarm / Emergency Communication System - Area A
FA203B Level 3 Fire Alarm / Emergency Communication System - Area B
FP001 Fire Protection - New Building Riser Diagram and Riser Notes
FP001C Fire Protection - Gym Riser and Notes
FP101 Level 1 - Fire Protection Plan
FP102 Level 2 - Fire Protection Plan
FP102C Level 2 - Fire Protection Plan - Area C
FP103 Level 3 - Fire Protection Plan
M001 Mechanical Legend
M101A Level 1 - Mechanical Plan - Area A
M101B Level 1 - Mechanical Plan - Area B
M102A Level 2 - Mechanical Plan - Area A
M102B Level 2 - Mechanical Plan - Area B
M102C Level 2 - Mechanical Plan - Area C
M103A Level 3 - Mechanical Plan - Area A
M103B Level 3 - Mechanical Plan - Area B
M120A Mechanical Roof Plan - Area A
M120B Mechanical Roof Plan - Area B
M120C Mechanical Roof Plan - Area C
M201A Level 1 - Mechanical Piping Plan - Area A
M201B Level 1 - Mechanical Piping Plan - Area B
M202A Level 2 - Mechanical Piping Plan - Area A
M202B Level 2 - Mechanical Piping Plan - Area B
M202C Level 2 - Mechanical Piping Plan - Area C
M203A Level 3 - Mechanical Piping Plan - Area A
M203B Level 3 - Mechanical Piping Plan - Area B
M301A Level 1 - Mechanical Reflected Ceiling Plan - Area A
M301B Level 1 - Mechanical Reflected Ceiling Plan - Area B
M302A Level 2 - Mechanical Reflected Ceiling Plan - Area A
M302B Level 2 - Mechanical Reflected Ceiling Plan - Area B
M302C Level 2 - Mechanical Reflected Ceiling Plan - Area C
M303A Level 3 - Mechanical Reflected Ceiling Plan - Area A
M303B Level 3 - Mechanical Reflected Ceiling Plan - Area B
M501 Mechanical Details
M502 Mechanical Details
M503 Mechanical Details
M601 Mechanical Schedules
M602 Mechanical Schedules
M603 Mechanical Schedules
M604 Mechanical Schedules
M605 Mechanical Schedules
M606 Mechanical Schedules
M701 Mechanical Controls
M702 Mechanical Controls
M703 Mechanical Controls
M704 Mechanical Controls
M705 Mechanical Controls
E001 Electrical Legend
E002 Technology Legend
E003 Sequence of Operation and Commissioning Requirements
E004 Lighting Fixture Schedule
E005 Mechanical Electrical Connection Schedule
E006 Mechanical Electrical Connection Schedule
E007 Theatrical Lighting Riser Diagram (Alternate Bid #6)
E101 Electrical Site Plan - Southeast
E102 Electrical Site Plan - Northeast
E103 Electrical Site Plan - Northwest
E103A Electrical Site Plan - Northwest Alternative Bid #1
E104 Electrical Site Plan - Southwest
E110 Systems Site Plan Overall - CCTV Coverage Plan
E111 Systems Site Plan - Southeast
E112 Systems Site Plan - Northeast
E113 Systems Site Plan - Northwest
E114 Systems Site Plan - Southwest
E201A Level 1 - Lighting Plan - Area A
E201B Level 1 - Lighting Plan - Area B
E202A Level 2 - Lighting Plan - Area A
E202B Level 2 - Lighting Plan - Area B
E202C Level 2 - Lighting Plan - Area C
E203A Level 3 - Lighting Plan - Area A
E203B Level 3 - Lighting Plan - Area B
E204 Stairwell Lighting Section
E301A Level 1 - Power Plan - Area A
E301B Level 1 - Power Plan - Area B
E302A Level 2 - Power Plan - Area A
E302B Level 2 - Power Plan - Area B
E302C Level 2 - Power Plan - Area C
E302D Level 2 - Enlarged Power Plan - Kitchen
E303A Level 3 - Power Plan - Area A
E303B Level 3 - Power Plan - Area B
E304A Rooftop - Power Plan - Area A
E304B Rooftop - Power Plan - Area B
E311A Level 1 - Mechanical Equipment Connection Plan - Area A
E311B Level 1 - Mechanical Equipment Connection Plan - Area B
E312A Level 2 - Mechanical Equipment Connection Plan - Area A
E312B Level 2 - Mechanical Equipment Connection Plan - Area B
E312C Level 2 - Mechanical Equipment Connection Plan - Area C
E313A Level 3 - Mechanical Equipment Connection Plan - Area A
E313B Level 3 - Mechanical Equipment Connection Plan - Area B
E314A Rooftop - Mechanical Equipment Connection Plan - Area A
E314B Rooftop - Mechanical Equipment Connection Plan - Area B
E314C Rooftop - Mechanical Equipment Connection Plan - Area C
E401A Level 1 - Systems Plan - Area A
E401B Level 1 - Systems Plan - Area B
E402A Level 2 - Systems Plan - Area A
E402B Level 2 - Systems Plan - Area B
E402C Level 2 - Systems Plan - Area C
E403A Level 3 - Systems Plan - Area A
E403B Level 3 - Systems Plan - Area B
E411 Level 1 - Systems Overall Plan
E412 Level 2 - Systems Overall Plan
E413 Level 3 - Systems Overall Plan
E501 Systems Enlarged Plans
E600 Electrical One-Line Diagram
E601 Electrical One-Line Diagram
E602 Electrical One-Line Diagram
E611 Panel Schedules
E612 Panel Schedules
E613 Panel Schedules
E614 Panel Schedules
E615 Panel Schedules
E616 Panel Schedules
E617 Panel Schedules
E701 Telecom Outlet Details
E702 Telecom Pathway and Grounding Details
E703 CCTV Details
E704 Telecom Riser Diagram
E705 Access Control System Details
E706 CCTV Camera Matrix
E707 Classroom and Miscellaneous AV Details
E708 Music and Commons AV Details
E709 Elevation Details
E711 Electrical Details
FS1.00 Foodservice General Notes
FS1.01 Foodservice Floor Plan and Schedule
FS1.02 3D View
FS1.03 3D View
FS2.01 Foodservice Plumbing Plan
FS3.01 Foodservice Electrical Plan
FS4.01 Foodservice Special Condition Plan
FS5.01 Foodservice Ventilation Plan
FS6.00 Exhaust Hood Details
FS6.01 Exhaust Hood Details
FS6.02 Refrigeration System Details
FS6.03 Walk-In Cooler / Freezer Details
FS6.04 Elevations and Details
FS6.05 Section Details
FS6.06 Standard Details