Everett Community College: Baker Hall - Budget 2: Design Development, Everett, WA - Technical Appendix    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 264 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Technical Appendix
Page 3 Table of Contents
Page 5 Executive Summary
Page 7 Project Schedule Diagram
Page 8 DD Phase Weekly Schedule - 15 Weeks
Page 9 Project Team List
Page 11 Engagement Groups Diagram
Page 12 Engagement Groups Members
Page 13 Design Narrative
Page 15 Materials & System Narrative
Page 99 LEED Overview
Page 103 Division 1 / Section 015713 Temporary Erosion & Sedimentation Control
Page 108 Division 02 / Section 024113 Site Demolition
Page 112 Division 31 / Section 312000 Earth Moving
Page 120 Section 312335 Excavating, Backfilling & Compacting for Utilities & Structures
Page 127 Section 321216 Asphalt Paving
Page 132 Section 321611 Cement Concrete Sidewalk, Curbs & Gutters
Page 138 Section 321724 Pavement Markings & Signage
Page 140 Division 33 / Section 331000 Water Utilities
Page 150 Section 333000 Sanitary Sewerage Utilities
Page 155 Section 334000 Storm Drainage Utilities
Page 161 Section 334600 Subdrainage
Page 165 Section 129300 Site Furnishings
Page 166 Section 321320 Site Concrete Finishes
Page 167 Section 328400 Irrigation
Page 175 Section 329115 Soil Preparation
Page 189 Section 329200 Turf & Grasses
Page 193 Section 329300 Plants
Page 202 Design Development Specification Products & Materials
Page 226 Division 1 / Section 017419 Construction & Demolition Waste Management
Page 234 Section 018113 Sustainable Design Requirements
Page 255 LEED Checklist
Page 256 LEED Materials Submittal Form
Page 257 Buy Clean Buy Fair Reporting Form
Page 258 Section 018119 Construction Indoor Air Quality Management