Mercer Middle School - Bid Set 3, Seattle, WA - 100% CD - Bid Set 3 Plans - Part 2
M0.01 Mechanical Legend
M0.02 Mechanical Abbreviations & General Notes
M0.03 Mechanical Schedules
M0.04 Mechanical Schedules
M0.05 Mechanical Schedules
M0.06 Mechanical Schedules
M0.07 Mechanical Schedules
M0.08 Mechanical Schedules
M1.00 Mechanical Site Plan
M1.11 Underground Plumbing Plan - Area A1
M1.12 Underground Plumbing Plan - Area A2
M1.13 Underground Plumbing Plan - Area B
M1.14 Underground Plumbing Plan - Area C1
M1.15 Underground Plumbing Plan - Area C2
M2.11 Plumbing Plan - Level 1 - Area A1
M2.12 Plumbing Plan - Level 1 - Area A2
M2.13 Plumbing Plan - Level 1 - Area B
M2.14 Plumbing Plan - Level 1 - Area C1
M2.15 Plumbing Plan - Level 1 - Area C2
M2.21 Plumbing Plan - Level 2 - Area A1
M2.22 Plumbing Plan - Level 2 - Area A2
M2.23 Plumbing Plan - Level 2 - Area B
M2.24 Plumbing Plan - Level 2 - Area C1
M2.25 Plumbing Plan - Level 2 - Area C2
M2.31 Plumbing Plan - Level 3 - Area A1
M2.32 Plumbing Plan - Level 3 - Area A2
M2.41 Plumbing Plan - Mechanical Attic - Area A1
M2.42 Plumbing Plan - Mechanical Attic - Area A2
M3.11 HVAC Plan - Level 1 - Area A1
M3.12 HVAC Plan - Level 1 - Area A2
M3.13 HVAC Plan - Level 1 - Area B
M3.14 HVAC Plan - Level 1 - Area C1
M3.15 HVAC Plan - Level 1 - Area C2
M3.21 HVAC Plan - Level 2 - Area A1
M3.22 HVAC Plan - Level 2 - Area A2
M3.23 HVAC Plan - Level 2 - Area B
M3.24 HVAC Plan - Level 2 - Area C1
M3.25 HVAC Plan - Level 2 - Area C2
M3.31 HVAC Plan - Level 3 - Area A1
M3.32 HVAC Plan - Level 3 - Area A2
M3.41 HVAC Plan - Mechanical Attic - Area A1
M3.42 HVAC Plan - Mechanical Attic - Area A2
M4.11 HVAC Piping Plan - Level 1 - Area A1
M4.12 HVAC Piping Plan - Level 1 - Area A2
M4.13 HVAC Piping Plan - Level 1 - Area B
M4.14 HVAC Piping Plan - Level 1 - Area C1
M4.15 HVAC Piping Plan - Level 1 - Area C2
M4.21 HVAC Piping Plan - Level 2 - Area A1
M4.22 HVAC Piping Plan - Level 2 - Area A2
M4.23 HVAC Piping Plan - Level 2 - Area B
M4.24 HVAC Piping Plan - Level 2 - Area C1
M4.25 HVAC Piping Plan - Level 2 - Area C2
M4.31 HVAC Piping Plan - Level 3 - Area A1
M4.32 HVAC Piping Plan - Level 3 - Area A2
M4.41 HVAC Piping Plan - Mechanical Attic - Area A1
M4.42 HVAC Piping Plan - Mechanical Attic - Area A2
M5.01 Enlarged Boiler Room Plan
M5.02 Enlarged Kitchen Plan
M5.03 Enlarged Plumbing Plans
M5.04 Enlarged Plumbing Plans
M5.05 Mechanical Sections
M5.06 Mechanical Sections
M5.07 Mechanical Sections
M5.08 Mechanical Sections
M6.01 Mechanical Roof Plan
M7.01 First Floor Fire Sprinkler Plan
M7.02 Second Floor Fire Sprinkler Plan
M7.03 Third Floor Fire Sprinkler Plan
M7.04 Mechanical Attic Fire Sprinkler Plan
M8.01 Condenser Water Piping Riser Diagram
M8.02 Dual Temperature Water Piping Riser Diagram
M8.03 Condenser Water Manifold Riser Diagram
M8.04 Waste Vent Riser Diagram
M8.05 Waste Vent Riser Diagram
M8.06 Waste Vent Riser Diagram
M8.07 Waste Vent Riser Diagram
M8.08 Waste Vent Riser Diagram
M8.09 Waste Vent Riser Diagram
M8.10 Waste Vent Riser Diagram
M8.11 Waste Vent Riser Diagram
M8.12 Waste Vent Riser Diagram
M8.13 Waste Vent Riser Diagram
M8.14 Domestic Water Riser Diagram
M8.15 Domestic Water Riser Diagram
M8.16 Domestic Water Riser Diagram
M8.17 Domestic Water Riser Diagram
M8.18 Domestic Water Riser Diagram
M8.19 Domestic Water Riser Diagram
M8.20 Rain Leader & Overflow Riser Diagram
M9.01 Mechanical Details
M9.02 Mechanical Details
M9.03 Mechanical Details
M9.04 Mechanical Details
M9.05 Mechanical Details
M9.06 Mechanical Details
M10.01 Mechanical Control Diagrams
M10.02 Mechanical Control Diagrams
M10.03 Mechanical Control Diagrams
M10.04 Mechanical Control Diagrams
M10.05 Mechanical Control Diagrams
M10.06 Mechanical Control Diagrams
M10.07 Mechanical Control Diagrams
M10.08 Mechanical Control Diagrams
M10.09 Mechanical Control Diagrams
M10.10 Mechanical Control Diagrams
M10.11 Mechanical Control Diagrams
E0.01 Electrical Legend and Drawing Index
E0.02 Electrical Abbreviations and General Notes
E0.03 Telecom Rough-In Schedules
E0.05 Light Fixture Schedule
E0.06 Electrical Schedules
E1.00 Electrical Site Plan
E1.00a Lighting Control Zone Site Plan
E2.00C Electrical Energy Code Forms
E2.11 Lighting Floor Plan - Level 1 - Area A1
E2.11a Lighting Control Zone - Level 1 - Area A1
E2.12 Lighting Floor Plan - Level 1 - Area A2
E2.12a Lighting Control Zone - Level 1 - Area A2
E2.13 Lighting Floor Plan - Level 1 - Area B
E2.13a Lighting Control Zone - Level 1 - Area B
E2.14 Lighting Floor Plan - Level 1 - Area C1
E2.14a Lighting Control Zone - Level 1 - Area C1
E2.15 Lighting Floor Plan - Level 1 - Area C2
E2.15a Lighting Control Zone - Level 1 - Area C2
E2.21 Lighting Floor Plan - Level 2 - Area A1
E2.21a Lighting Control Zone - Level 2 - Area A1
E2.22 Lighting Floor Plan - Level 2 - Area A2
E2.22a Lighting Control Zone - Level 2 - Area A2
E2.23 Lighting Floor Plan - Level 2 - Area B
E2.23a Lighting Control Zone - Level 2 - Area B
E2.24 Lighting Floor Plan - Level 2 - Area C1
E2.24a Lighting Control Zone - Level 2 - Area C1
E2.25 Lighting Floor Plan - Level 2 - Area C2
E2.25a Lighting Control Zone - Level 2 - Area C2
E2.31 Lighting Floor Plan - Level 3 - Area A1
E2.31a Lighting Control Zone - Level 3 - Area A1
E2.32 Lighting Floor Plan - Level 3 - Area A2
E2.32a Lighting Control Zone - Level 3 - Area A2
E2.33 Lighting Floor Plan - Area A1 A2 Penthouses
E2.33a Lighting Control Zone - Area A1 A2 Penthouses
E3.11 Power Floor Plan - Level 1 - Area A1
E3.12 Power Floor Plan - Level 1 - Area A2
E3.13 Power Floor Plan - Level 1 - Area B
E3.14 Power Floor Plan - Level 1 - Area C1
E3.15 Power Floor Plan - Level 1 - Area C2
E3.21 Power Floor Plan - Level 2 - Area A1
E3.22 Power Floor Plan - Level 2 - Area A2
E3.23 Power Floor Plan - Level 2 - Area B
E3.24 Power Floor Plan - Level 2 - Area C1
E3.25 Power Floor Plan - Level 2 - Area C2
E3.31 Power Floor Plan - Level 3 - Area A1
E3.32 Power Floor Plan - Level 3 - Area A2
E3.33 Power Floor Plan - Area A1 & A2 Penthouses
E3.41 Power Floor Plan - Roof
E3.51 Roof Plan - Solar Readiness
E5.11 Fire Alarm Floor Plan - Level 1 - Area A1
E5.12 Fire Alarm Floor Plan - Level 1 - Area A2
E5.13 Fire Alarm Floor Plan - Level 1 - Area B
E5.14 Fire Alarm Floor Plan - Level 1 - Area C1
E5.15 Fire Alarm Floor Plan - Level 1 - Area C2
E5.21 Fire Alarm Floor Plan - Level 2 - Area A1
E5.22 Fire Alarm Floor Plan - Level 2 - Area A2
E5.23 Fire Alarm Floor Plan - Level 2 - Area B
E5.24 Fire Alarm Floor Plan - Level 2 - Area C1
E5.25 Fire Alarm Floor Plan - Level 2 - Area C2
E5.31 Fire Alarm Floor Plan - Level 3 - Area A1
E5.32 Fire Alarm Floor Plan - Level 3 - Area A2
E5.33 Fire Alarm Floor Plan - Area A1 & A2 Penthouses
E6.11 Telecom Floor Plan - Level 1 - Area A1
E6.12 Telecom Floor Plan - Level 1 - Area A2
E6.13 Telecom Floor Plan - Level 1 - Area B
E6.14 Telecom Floor Plan - Level 1 - Area C1
E6.15 Telecom Floor Plan - Level 1 - Area C2
E6.21 Telecom Floor Plan - Level 2 - Area A1
E6.22 Telecom Floor Plan - Level 2 - Area A2
E6.23 Telecom Floor Plan - Level 2 - Area B
E6.24 Telecom Floor Plan - Level 2 - Area C1
E6.25 Telecom Floor Plan - Level 2 - Area C2
E6.31 Telecom Floor Plan - Level 3 - Area A1
E6.32 Telecom Floor Plan - Level 3 - Area A2
E6.41 Telecom Floor Plan - Roof
E6.42 Telecom Floor Plan - Roof - Area A2
E7.01 Enlarged Kitchen Power Plan and Details
E7.02 Electrical Details
E7.03 Electrical Details
E7.04 Electrical Details
E7.05 Electrical Details
E7.06 Electrical Details
E7.07 Enlarged Electrical & Mechanical Room Power Plans
E7.08 Lighting Control Zone Maps
E7.09 Controlled Receptacle Zone Maps
E8.01 Telecom Enlarged Plans
E8.02 Telecom Enlarged Plans
E8.03 Telecom Enlarged Plans
E8.04 Telecom Details
E8.05 Telecom Details
E8.06 Telecom Details
E9.01 Electrical One-Line Diagram
E9.02 Electrical One-Line Diagram
E9.03 Electrical One-Line Diagram
E9.04 Photovoltaic One-Line Diagram
E10.01 Panel Schedules
E10.02 Panel Schedules
E10.03 Panel Schedules
E10.04 Panel Schedules
E10.05 Panel Schedules
E10.06 Panel Schedules
E10.07 Panel Schedules
E10.08 Panel Schedules
T1.00 Overall Site Plan - AV and Security & Legend
T2.11 Floor Plan - Level 1 - Area A1 - AV and Security
T2.12 Floor Plan - Level 1 - Area A2 - AV and Security
T2.13 Floor Plan - Level 1 - Area B - AV and Security
T2.14 Floor Plan - Level 1 - Area C1 - AV and Security
T2.15 Floor Plan - Level 1 - Area C2 - AV and Security
T2.21 Floor Plan - Level 2 - Area A1 - AV and Security
T2.22 Floor Plan - Level 2 - Area A2 - AV and Security
T2.23 Floor Plan - Level 2 - Area B - AV and Security
T2.24 Floor Plan - Level 2 - Area C1 - AV and Security
T2.25 Floor Plan - Level 2 - Area C2 - AV and Security
T2.31 Floor Plan - Level 3 - Area A1 - AV and Security
T2.32 Floor Plan - Level 3 - Area A2 - AV and Security
T2.41 Roof Plan - Overall - AV and Security
T3.00 AV Details
T3.01 AV Details
T3.02 Riser Diagram
T3.03 AV Elevations
T3.04 AV Elevations
FS1.00 Food Service General Notes
FS1.01 Food Service Floor Plan and Schedule
FS1.02 Food Service 3D Views
FS1.03 Food Service 3D Views
FS2.01 Food Service Plumbing Requirement Plan
FS3.01 Food Service Electrical Requirement Plan
FS4.01 Food Service Special Condition Requirements
FS5.01 Food Service Elevations and Details
FS5.02 Food Service Elevations and Details
FS5.03 Food Service Elevations and Details
FS6.01 Food Service Exhaust Hood Details
FS6.02 Food Service Exhaust Hood Details
FS6.03 Food Service Exhaust Hood Details
FS6.04 Food Service Exhaust Hood Details
FS6.05 Food Service DCV Control Panel Details
FS6.06 Food Service DCV Control Panel Details
FS6.07 Food Service Fire Protection Details
FS6.08 Food Service Exhaust Hood Details
FS7.01 Food Service Refrigeration Details
FS8.01 Walk-In Cooler / Freezer Details
FS8.02 Walk-In Cooler / Freezer Details