Page 1 Cover Page
Page 2 Section 000101 Title Page
Page 4 Section 000107 Seals Page
Page 5 Section 000110 Table of Contents
Page 16 Section 210000 Fire Suppression Work Specified in Division 23
Page 17 Section 211000 Automatic Fire Suppression Systems
Page 30 Section 213000 Fire Pumps
Page 42 Section 220000 Plumbing Work Specified in Division 23
Page 43 Section 220800 Commissioning of Plumbing
Page 45 Section 221116 Domestic Water System
Page 61 Section 221120 Plumbing Valves
Page 70 Section 221123 Plumbing Pumps
Page 80 Section 221300 Soil, Waste Vent & Storm Drain Piping Systems
Page 90 Section 221500 Compressed Air Piping Systems
Page 98 Section 2230000 Plumbing Equipment
Page 103 Section 224000 Plumbing Fixtures
Page 110 Section 226600 Acid Waste & Vent Piping System
Page 117 Section 230500 General Provisions
Page 132 Section 230505 Project Closeout & System Start Up
Page 136 Section 230510 Basic Materials & Methods
Page 151 Section 230512 Indoor Air Quality - HVAC
Page 154 Section 230513 Electrical Provisions for Mechanical Work
Page 163 Section 230548 Vibration Isolation
Page 175 Section 230548 Vibration Isolation
Page 186 Section 230550 Seismic Control
Page 192 Section 230593 Testing, Adjusting & Balancing
Page 202 Section 230700 Mechanical Insulation
Page 216 Section 230800 Commissioning of Mechanical
Page 218 Section 230810 Mechanical Systems Training
Page 223 Section 230820 Mechanical Systems Operation & Maintenance Manuals
Page 228 Section 230900 Automatic Temperature Controls
Page 276 Section 230915 Variable Frequency Drives
Page 284 Section 231126 Liquefied Petroleum Piping Systems
Page 289 Section 232113 Hydronic Piping Systems
Page 301 Section 232116 Piping Specialties
Page 314 Section 232120 Hydronic Valves
Page 319 Section 232123 Hydronic Pumps
Page 324 Section 232140 Vertical Bore Geothermal Loop Heat Exchanger Piping
Page 334 Section 232300 Refrigerant Piping Systems
Page 338 Section 232500 Water Treatment
Page 344 Section 233100 Air Distribution
Page 360 Section 233300 Air Distribution Accessories
Page 373 Section 233400 Air Distribution Equipment
Page 390 Section 233513 Sawdust Collection Systems
Page 395 Section 233700 Air Devices
Page 399 Section 234100 Filters
Page 403 Section 235200 Boilers
Page 409 Section 238100 Packaged HVAC Equipment
Page 418 Section 238200 Terminal Heat Transfer Equipment
Page 423 Section 260010 Requirements for Electrical, Communications & ESS
Page 438 Section 260519 Low-Voltage Conductors & Cables
Page 443 Section 260526 Grounding & Bonding
Page 450 Section 260529 Hangers & Supports
Page 456 Section 260533 Raceway & Boxes
Page 468 Section 260534 Raceway & Boxes for Communications & ESS
Page 473 Section 260543 Underground Raceway & Boxes
Page 479 Section 260548 Vibration & Seismic Controls
Page 484 Section 260553 Identification for Electrical Systems
Page 495 Section 260573 Power Systems Protective Device Study
Page 500 Section 260800 Commissioning of Electrical
Page 502 Section 260923 Lighting Control System
Page 523 Section 262200 Low-Voltage Transformers
Page 530 Section 262413 Switchboards
Page 544 Section 262416 Panelboards
Page 560 Section 262653 Electric Vehicle Charging Equipment
Page 570 Section 262726 Wiring Devices
Page 579 Section 262816 Enclosed Switches & Circuit Breakers
Page 588 Section 263100 Solar Photovoltaic System
Page 597 Section 263213 Engine Generator & Associated Equipment
Page 621 Section 265100 Interior Lighting
Page 629 Section 265623 Exterior Lighting
Page 636 Section 265668 Exterior Athletic Lighting (Alternate Bid)
Page 643 Section 271500 Data & Communications Cabling
Page 676 Sample Test Results
Page 684 Section 273000 Two Way Communications
Page 689 Section 274116 Classroom, Conference, Library & Science AV System
Page 699 Section 274117 Commons Audio Visual System
Page 714 Section 274118 Music Room Audio Visual
Page 726 Section 274119 Gym Audio Visual System
Page 742 Section 274120 Auxiliary Gym Audio
Page 753 Section 274121 Fitness & Weight Audio Visual System
Page 763 Section 275123 Intercom & Display System
Page 779 Section 280800 Commissioning of Electronic Safety & Security
Page 781 Section 281300 Access Control System
Page 798 Section 281600 Security System
Page 818 Section 282300 Video Surveillance System
Page 836 Section 283111 Fire Alarm with Voice Alarm System
Page 874 Section 311000 Site Preparation
Page 879 Section 312000 Earth Moving
Page 893 Section 321200 Asphalt Paving
Page 899 Section 321300 Concrete Paving
Page 906 Section 321540 Permeable Crushed Rock Base
Page 911 Section 321723 Pavement Markings
Page 915 Section 321723.43 Playground Striping
Page 918 Section 321813 Field Synthetic Grass Surfacing
Page 930 Section 321823.39 Rubberized Running Track Surfacing
Page 936 Section 321823.49 Elastic Layer
Page 940 Section 323000 Site Improvements
Page 949 Section 323113 Chain Link Fences & Gates
Page 954 Section 323119 Metal Fencing
Page 957 Section 328000 Irrigation
Page 970 Section 329000 Planting
Page 990 Section 331000 Water Utilities
Page 994 Section 333000 Sanitary Sewer
Page 999 Section 334000 Storm Drainage
Page 1003 Section 334111 Field & Playground Subdrainage
Page 1007 Section 334113 Foundation Drainage