Printable Drawing List

AutoZone #9278, Bellingham, WA - Plans

A-0 Cover Sheet / Code Analysis
C-1 Site Plan / Notes / Details
D-1 Demolition Plan / Notes / Details
A-1 Floor Plan / Keynotes
A-2 Door Schedule / Details / Restroom Plan / Elevation / Notes
A-3 Exterior Elevations / Notes
A-4 Interior Elevations / Details / Notes
A-5 Fixture / Floor Tile Plan / Details / Notes
A-6 Reflected Ceiling Plan / Details
R1 As-Built Drawing Reference Only
R2 As-Built Drawing Reference Only
R3 As-Built Drawing Reference Only
S0.1 Light Gauge Framing Details & Project Notes
S1 Mezzanine Demo Plan & Shoring Notes
S2 Alteration Plan, Restroom Ceiling Framing Plan & Project Plan Notes
S3 Enlarged East Door Opening Elevation with Details & West Wall Framing Elevations & Details
S4 Interior Wall Framing Section & Details
M-1 HVAC Roof Plan / Notes / Details
M-1.1 HVAC Plan / Notes / Details
M-1.2 HVAC Details
P-1 Plumbing Plans / Fixture Schedule / Notes / Details
E-1 Power Plan / Details / Notes
E-2 Power Pole Plan / Notes
E-2.1 Door Alarm and EAS Details
E-3 Lighting Plan / Notes / Details
E-4 1-Line Service Diagram / Panel Schedules
E-5 Lighting Control Panel / Telephone Board / Panel Details
E-6 Venstar HVAC and Lighting Control