Lincoln Street Studio Apartments, Bellingham, WA - Plans
A0.1 List of Drawing, Applicable Code, Building Stats, Vicinity Map, Legal Description
A0.2 General Notes
A0.3 Barrier Free Notes
A0.4 Barrier Free Requirements
A0.5 ADA Guidelines & Diagrams
A0.6 Window & Door Schedules
A0.7 Window & Door Elevations
A0.8 Room Finish Schedule
A1.1 Site Plan
A2.1 Typical Units Studio A & B1
A2.2 Typical Units Studio B1, B2, B3, B4 & B5
A2.3 Typical Units Studio C1, C2, C3 & C4
A2.4 Typical Units Studio C5, C6, C7, C8 & D
A3.1 1st Floor Plan
A3.2 2nd Floor Plan
A3.3 3rd Floor Plan
A3.4 Roof Plan
A3.1LS 1st Floor Plan
A3.2LS 2nd Floor Plan
A3.3LS 3rd Floor Plan
A4.1 Elevations
A5.1 Section A-A
A5.2 Section B-B
A5.3 Section C-C
A5.4 Section D-D
A5.5 Section E-E
A6.1 Interior Elevations
A7.1 Stair Enclosure Plans
D1.1 Details
D1.2 Details
D1.3 Details
RA1.1 Rated Assemblies
RP1.1 Rated Penetrations
AB0.1 General Building Enclosure Notes
AB0.2 Materials Matrix
AB1.1 Air Barrier Floor Plans
AB2.1 Air Barrier Section
AB3.1 Air Barrier Details
AB3.2 Penetration and Sequence Details
AB3.3 Penetration and Sequence Details
S1.1 Structural Notes
S1.2 Structural Notes
S2.1 Foundation Plan
S2.2 Second Floor Framing Plan
S2.3 Third Floor Framing Plan
S2.4 Roof Framing Plan
S3.1 Schedules
S4.1 Foundation Details
S5.1 Wood Framing Details
S5.2 Wood Framing Details
S5.3 Wood Framing Details
S6.1 Roof Framing Details
SS1.1 Structural Notes
SS2.1 Vault Foundation and Lid Plans and Sections
SS2.2 Detention Vault Details
SS2.3 Site Wall Details
M0.0 Cover Sheet & General Information
M0.1 Mechanical Specifications
M0.2 Mechanical Schedules
M1.1 1st Floor Mechanical Plan
M1.2 2nd Floor Mechanical Plan
M1.3 3rd Floor Mechanical Plan
M2.1 Typical Unit Mechanical Plans
M3.1 Mechanical Details
P0.0 Plumbing Cover Sheet & General Information
P0.1 Plumbing Specifications
P0.2 Plumbing Schedules
P1.0 Underground Plumbing Plan
P1.1 1st Floor Plumbing Plan
P1.2 2nd Floor Plumbing Plan
P1.3 3rd Floor Plumbing Plan
P2.1 Typical Unit Plumbing Plans
P3.1 Plumbing Details
P4.1 Domestic Hot Water Diagram
E0.0 Legend & Abbreviations
E0.1 General Notes
E0.2 Electrical Specifications
E0.3 Electrical Specifications
E0.4 Electrical Specifications
E1.0 Site Plan
E1.0IS Site Plan - Illumination Study
E1.1 First Floor - Lighting Plan
E1.2 Second Floor - Lighting Plan
E1.3 Third Floor - Lighting Plan
E2.1 First Floor - Power Plan
E2.2 Second Floor - Power Plan
E2.3 Third Floor - Power Plan
E3.1 First Floor - Systems Plan
E3.2 Second Floor - Systems Plan
E3.3 Third Floor - Systems Plan
E4.1 Enlarged Unit - Lighting Plan
E4.2 Enlarged Unit - Power Plan
E4.3 Enlarged Unit - Systems Plan
E5.1 One-Line Diagram
E6.1 Panel Schedules
E7.1 Details & Mechanical Equipment Schedule
E8.1 NREC & Luminaire Schedule
C1.01 Cover Sheet & Existing Conditions
C2.01 Temporary Erosion & Sediment Control Plan
C2.02 Temporary Erosion & Sediment Control Details & SWPPP
C3.01 Site & Utility Plan
C4.01 Storm & Grading Plan
C5.01 Site Details
C5.02 Storm Details
C5.03 Storm Vault Details
C5.04 Utility Details
C5.05 Fire Details
WALL1 Wall Plan
PFC1 Cover Sheet & Existing Conditions
PFC2 Temporary Erosion & Sediment Control Plan
PFC3 Temporary Erosion & Sediment Control Details & SWPPP
PFC4 Water Main Plan & Profile
PFC5 Alley Improvement Plan
PFC6 Project Details & General Notes
PFC7 Water Details
L0 Cover Sheet
L1.1 Tree Protection Plan
L2.1 Material Plan & Finishes Schedule
L3.1 Dimension Plan
L4.1 Planting Plan
L4.2 Planting Details
L4.3 Planting Specifications
L5.1 Irrigation Diagram
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.