Cover Sheet
G0.01 Sheet Index - Volume I
G1.01 Overall First Floor Plan
G1.02 Overall Second Floor Plan
G1.03 Overall Equipment Platform Plan
G1.04 Overall 3D Views
G2.00 Building and Energy Code Summary
G2.01 Overall Code Plan - First Floor
G2.02 Overall Code Plan - Second Floor
G2.03 Overall Code Plan - Equipment Platforms
G2.04 Site Plan
G2.05 Code Exiting Plans - Building 1
G2.06 Code Exiting Plans - Building 2
G2.07 Code Exiting Plans - Building 3
G2.08 Code Exiting Plans - Building 4
G2.09 Code Exiting Plans - Building 5
G2.10 Code Exiting Phasing Plan - Phase 1A
G2.11 Code Exiting Phasing Plan - Phase 1B
G2.12 Code Exiting Phasing Plan - Phase 2A
G2.13 Code Exiting Phasing Plan - Phase 2B Level 1
G2.14 Code Exiting Phasing Plan - Phase 2B Level 2
G2.15 Code Exiting Phasing Plan - Phase 3A
G2.16 Code Exiting Phasing Plan - Phase 3B
G2.17 Code Exiting Phasing Plan - Phase 4A
G2.18 Code Exiting Phasing Plan - Phase 4B
G2.30 Building Sections - Air Barrier
G3.01 Fireproofing Plan - First Floor
G3.02 Fireproofing Plan - Second Floor
G3.03 Fireproofing Plan - Roof
G3.04 Fireproofing Sections
G4.01 Code Details
G5.01 Phasing Plan - Phase 1A
G5.02 Phasing Plan - Phase 1B
G5.03 Phasing Plan - Phase 2A
G5.04 Phasing Plan - Phase 2B
G5.05 Phasing Plan - Phase 3A
G5.06 Phasing Plan - Phase 3B
G5.07 Phasing Plan - Phase 4A
G5.08 Phasing Plan - Phase 4B & 4C
G5.09 Phasing Sections & Details
G5.10 Phasing Sections & Details
C1.00 TESC and Demolition Overall
C1.01 TESC and Demolition Plan
C1.02 TESC and Demolition Plan
C1.03 TESC and Demolition Plan
C1.04 TESC and Demolition Plan
C1.05 TESC Details
C1.06 TESC Notes
C2.00 Grading and Drainage Overall
C2.01 Grading and Drainage Plan
C2.02 Grading and Drainage Plan
C2.03 Grading and Drainage Plan
C2.04 Grading and Drainage Plan
C2.05 Drainage Details
C2.06 Drainage Details
C2.07 Drainage Details & Notes
C2.08 Curb Ramp Details
C2.09 Drainage Profiles
C2.10 Drainage Profiles
C2.11 Drainage Profiles
C3.00 Utilities Overall
C3.01 Utilities Plan
C3.02 Utilities Plan
C3.03 Utilities Plan
C3.04 Utilities Plan
C3.05 Utilities Notes & Details
C3.06 Sewer Profiles
C3.07 Water Profile
C3.08 Water Profile
C5.00 Paving Overall
C5.01 Paving Plan
C5.02 Paving Plan
C5.03 Paving Plan
C5.04 Paving Plan
C5.05 Paving Details
C5.06 Paving Details
C6.00 Frontage Overall
C6.01 Frontage Demolition Factoria Blvd SE
C6.02 Frontage Demolition Factoria Blvd SE
C6.03 Frontage Demolition Coal Creek Parkway SE
C6.04 Frontage Demolition 124th Ave SE
C6.05 Frontage Demolition 124th Ave SE
C7.00 Frontage Factoria Blvd SE
C7.01 Frontage Factoria Blvd SE
C7.02 Frontage Factoria Blvd SE
C7.03 Frontage Factoria Blvd SE
C7.04 Frontage Coal Creek Parkway SE
C7.05 Frontage Coal Creek Parkway SE
C7.06 Frontage 124th Ave SE
C7.07 Frontage 124th Ave SE
C7.08 Frontage 124th Ave SE
C8.00 Frontage Factoria Blvd SE Channelization
C8.01 Frontage Factoria Blvd SE Channelization
C8.02 Frontage Coal Creek Parkway SE Channelization
C8.03 Frontage 124th Ave SE Channelization
C8.04 Frontage Details
C8.05 Frontage Details
C8.06 Frontage Details
C8.07 Frontage Driveway and Curb Ramp Details
C8.08 Frontage Driveway and Curb Ramp Details
C-9.00 Phase 1A
C-9.01 Phase 1B-2A
C-9.02 Phase 3A
C-9.03 Phase 4A
L1.00 Overall Site Plan
L1.01 Site Plan Enlargement
L1.02 Site Plan Enlargement
L1.03 Site Plan Enlargement
L1.04 Site Plan Enlargement
L1.05 Site Plan Enlargement
L1.06 Site Plan Enlargement
L1.07 Site Plan Enlargement
L1.08 Site Plan Enlargement
L2.00 Overall Planting Plan
L2.01 Planting Plan Enlargement
L2.02 Planting Plan Enlargement
L2.03 Planting Plan Enlargement
L2.04 Planting Plan Enlargement
L2.05 Planting Plan Enlargement
L2.06 Planting Plan Enlargement
L2.07 Planting Plan Enlargement
L2.08 Plant Schedule & Details
L2.09 Overall Tree Preservation Plan
L2.10 Tree Preservation Plan Enlargement
L2.11 Tree Preservation Plan Enlargement
L2.12 Tree Preservation Plan Enlargement
L2.13 Tree Preservation Plan Enlargement
L2.14 Tree Preservation Plan Enlargement
L2.15 Tree Preservation Plan Enlargement
L2.16 Tree Preservation Plan Enlargement
L2.17 Tree Preservation Table
L2.18 Tree Preservation Table
L2.19 Tree Preservation Table
L3.00 Overall Irrigation Plan
L3.01 Irrigation Plan Enlargement
L3.02 Irrigation Plan Enlargement
L3.03 Irrigation Plan Enlargement
L3.04 Irrigation Plan Enlargement
L3.05 Irrigation Plan Enlargement
L3.06 Irrigation Plan Enlargement
L3.07 Irrigation Plan Enlargement
L3.08 Irrigation Details
L3.09 Irrigation Details
L3.10 Irrigation Details - ROW
L4.00 Site Details
L4.01 Site Details
L4.02 Site Details
L4.03 Site Details
L4.04 Site Details
L4.05 Site Details
L4.06 Site Details
L4.07 Site Details
L5.00 Subdrainage Plan
L6.00 Overall Soil Plan
L6.01 Soil Plan Enlargement
L6.02 Soil Plan Enlargement
L6.03 Soil Plan Enlargement
L6.04 Soil Plan Enlargement
L6.05 Soil Plan Enlargement
L6.06 Soil Plan Enlargement
L6.07 Soil Plan Enlargement
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.