Naselle Hatchery Renovation Phase 2, Department of Fish & Wildlife, Pacific County, WA #PC:H43:2020-1 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 2079 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Table of Contents
Page 6 Section 00030 Notice to Contractors
Page 7 Vicinity Map to Bid Opening Site
Page 8 Section 00100 Instructions to Bidders
Page 14 Section 00200 Contractor Checklist
Page 17 Section 00300 Bid Form
Page 23 Section 00400 Supplements to Bid Form
Page 24 Standard Questionnaire for Qualification of Contractors
Page 26 Section 00500 Public Works Contract
Page 29 Section 00620 Retainage in Lieu of Performance Bond Option on Contracts of $150,000 or Less
Page 30 Section 00630 Retainage Investment Options
Page 31 Section 00640 Certificate of Liability Insurance
Page 32 Section 00650 Schedule of Values
Page 33 Section 00660 Certification of Monthly Payments to MWBE
Page 34 Section 00670 Statement of Apprentice / Journeyman Participation
Page 35 Section 00700 General Conditions
Page 84 Section 00800 Supplemental Conditions
Page 86 Attachment 1 Permits
Page 87 Permit Drawings
Page 96 State Environmental Policy Act (SEPA) Determination of Non-Significance (DNS)
Page 114 U.S Army Corps of Engineers (USACE)
Page 155 Hydraulic Project Approval (HPA)
Page 163 Pacific County & Ecology Environmental Permits
Page 175 Aquatic Use Authorizations (DNR) Pending
Page 176 Building Permit
Page 183 ORCAA Notice of Construction - Generator
Page 220 ORCAA Asbestos Demolition Notification
Page 226 Stormwater CGP (Pending)
Page 227 Attachment 2 - Cultural Resources
Page 228 Inadvertent Discovery Plan (IDP)
Page 247 Department of Archaeology & Historic Preservation (DAHP)
Page 249 Cultural Resources Assessment (CRA)
Page 298 Attachment 3 Reports
Page 299 Site Photos
Page 321 Geotechnical Report 2020
Page 441 Hazardous Materials Survey Report
Page 482 Existing Phase 1 Drawings
Page 575 Existing Intake Drawings
Page 584 Potholing Report
Page 598 Record of Survey
Page 601 Topographic Survey
Page 615 Opposite Bank Easement
Page 621 USGS River Gage Data 12010000
Page 626 Design Documentation Report
Page 1568 Division 1 General Requirements
Page 1574 Construction Specifications
Page 1576 Table of Contents
Page 1579 Section 01300 Contractor Submittals
Page 1585 Section 01311 CPM Construction Schedule
Page 1591 Section 01313 Construction & Schedule Constraints
Page 1593 Section 01350 Archeological Protection
Page 1595 Section 01351 Alteration Project Procedures
Page 1599 Section 01400 Quality Control
Page 1603 Section 01505 Mobilization
Page 1605 Section 01510 Temporary Utilities
Page 1609 Section 01550 Site Access & Storage
Page 1611 Section 01560 Temporary Environmental Controls
Page 1613 Section 01570 Temporary Erosion & Sediment Control
Page 1631 Section 01600 Products, Materials, Equipment & Substitutions
Page 1635 Section 01655 Gravity Pipeline Testing
Page 1641 Section 01660 Equipment Testing & Startup
Page 1647 Section 01730 Operating & Maintenance Manuals
Page 1649 Section 01732 Cutting & Patching
Page 1655 Section 02000 General Site Work Provisions
Page 1657 Section 02010 Subsurface Investigation
Page 1659 Section 02050 Demolition General
Page 1667 Section 02100 Site Preparation
Page 1669 Section 02140 Dewatering
Page 1677 Section 02160 Excavation Support Systems
Page 1681 Section 02180 Temporary Hatchery Process Water
Page 1686 Section 02210 Grading
Page 1688 Section 02220 Excavation, Backfill & Compaction
Page 1700 Section 02240 Construction Geotextile
Page 1704 Section 02270 Slope Protection & Erosion Control
Page 1706 Section 02272 Plantings
Page 1708 Section 02510 Hot Mix Asphalt
Page 1712 Section 02575 Pavement Repair
Page 1716 Section 02830 Chain-Link Fencing
Page 1723 Section 02900 Soil Management
Page 1725 Section 02930 Lawns & Grasses
Page 1731 Section 03000 General Concrete Provisions
Page 1734 Section 03100 Concrete Formwork
Page 1740 Section 03210 Reinforcing Steel
Page 1749 Section 03300 Cast-In-Place Concrete
Page 1777 Section 03370 Concrete Curing
Page 1782 Section 03400 Precast Structural Concrete
Page 1787 Section 05050 Fasteners
Page 1789 Section 05091 Welding
Page 1793 Section 05100 Structural Metal Framing
Page 1795 Section 05126 Galvanizing
Page 1797 Section 05500 Metal Fabrication
Page 1800 Section 05990 Miscellaneous Metals
Page 1806 Section 07720 Roof Accessories
Page 1808 Section 08000 General Doors & Windows Provisions
Page 1810 Section 08100 Hollow Metal Doors & Frames
Page 1812 Section 08330 Overhead Coiling Door
Page 1818 Section 08710 Finish Hardware
Page 1824 Section 08800 Glazing
Page 1830 Section 09900 Painting
Page 1836 Section 10200 Louvers
Page 1840 Section 11000 Equipment General Provisions
Page 1854 Section 11100 Pumps, General
Page 1864 Section 11130 Vertical Turbine Pumps
Page 1870 Section 11150 Horizontal End Suction Centrifugal Pumps
Page 1874 Section 11265 Packed Column Aerators
Page 1880 Section 11300 Traveling Belt Screens
Page 1885 Section 11400 Static Screen Cleaning Machine
Page 1891 Section 11600 Fish Crowder
Page 1897 Section 11720 Brail Lift
Page 1901 Section 11800 Electro-Anesthesia Equipment
Page 1905 Section 13121 Pre-Engineered Metal Building
Page 1916 Section 13500 Predator Netting
Page 1918 Section 13620 Structural Steel Pin Piles
Page 1924 Section 15000 Piping, General
Page 1936 Section 15006 Pipe Supports
Page 1944 Section 15010 Pipe & Equipment Insulation
Page 1946 Section 15025 Steel Pipe
Page 1950 Section 15030 Stainless Steel Pipe
Page 1952 Section 15060 PVC Pressure Pipe (ASTM D 1785, Modified)
Page 1956 Section 15200 Valves, General
Page 1962 Section 15201 Valve & Gate Actuators
Page 1968 Section 15202 Butterfly Valves
Page 1972 Section 15203 Check Valves
Page 1974 Section 15204 Ball Valves
Page 1978 Section 15206 Gate Valves
Page 1982 Section 15240 Flow Meters
Page 1986 Section 15245 Level Sensors
Page 1989 Section 15250 Hydraulic Gates, General
Page 1993 Section 15253 Fabricated Stainless Steel Slide Gates
Page 2001 Section 15254 Fabricated Aluminum Slide Gates
Page 2009 Section 15260 Overflow Inflatable Spillway Gates
Page 2017 Section 15300 Wood Stoplogs
Page 2022 Section 16000 General Electrical Provisions
Page 2030 Section 16050 Basic Materials & Methods
Page 2040 Section 16400 Service & Distribution
Page 2044 Section 16420 Motor Starters
Page 2048 Section 16430 Variable Frequency Drives
Page 2058 Section 16450 Grounding
Page 2062 Section 16470 Panelboards
Page 2066 Section 16500 Luminaires
Page 2068 Section 16900 Brail Hoist, Fishlock & Pump Controls
Page 2076 Section 16950 Electrical Tests