Tiger Summit Trailhead Renovation & Expansion, Department of Natural Resources, King County, WA #DNR-25-E16 - Addendum #3    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 38 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Addendum #3
Page 3 Section 334000 Storm Drainage System
Page 7 G1.1 Cover Sheet
Page 8 G2.1 Notes
Page 9 G2.2 Notes
Page 10 Sheet 4 Survey
Page 11 C1.1 TESC and Demolition Plan - North
Page 12 C1.2 TESC and Demolition Plan - South
Page 13 C1.3 TESC and Demolition Plan - South
Page 14 C2.1 Grading and Drainage Plan - North
Page 15 C2.2 Grading and Drainage Plan - South
Page 16 C2.3 Grading and Drainage Plan - South
Page 17 C2.3b Infiltration Facility Sections
Page 18 C2.4 Detail Grading
Page 19 C2.5 Detail Grading
Page 20 C2.6 Detail Grading
Page 21 C2.7 Sections
Page 22 C2.8 Profiles
Page 23 C3.1 Paving, Striping and Restoration Plan - North
Page 24 C3.2 Paving, Striping and Restoration Plan - South
Page 25 C3.3 Paving, Striping and Restoration Plan - South
Page 26 D1.1 Details
Page 27 D1.2 Details
Page 28 D1.3 Details
Page 29 D1.4 Details
Page 30 D1.5 Details
Page 31 D1.6 Details
Page 32 D1.7 Details
Page 33 D1.8 Restroom Structure
Page 34 L1.0 Landscape Plant Schedule
Page 35 L1.1 Landscape Plan - North
Page 36 L1.2 Landscape Plan - South
Page 37 L1.3 Landscape Plan - South
Page 38 L1.4 Landscape Details