This document has 230 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.
Page 1 Project Manual
Page 2 Section 000107 Seals Page
Page 3 Section 000103 Project Directory
Page 4 Section 000110 Table of Contents
Page 6 Section 003100 Available Project Information
Page 7 Advertisement for Bids
Page 10 Bidding Terms and Conditions
Page 12 Wage Theft Prevention - Responsible Bidder Criteria
Page 14 Plan Center List
Page 15 Unified Washington Military Department and National Guard Policy No. 18-01 - Camp Murray Access Requirements
Page 27 Agenda for Pre-Bid Walk-Through
Page 30 Division 00 Supplemental Bidder Responsibility Criteria
Page 32 Form 1 - Contractor Experience Detail
Page 33 Form 2 - Resume of Key Personnel for Proposed Contract
Page 35 Form 5 - Reference Evaluation Questionnaire
Page 36 Form 6 - Supplemental Responsibility Criteria Evaluation Score Sheet
Page 37 Instructions to Bidders / General Conditions
Page 38 Instructions to Bidders for Washington State Facilities Construction
Page 49 Section 007200 General Conditions for Washington State Facility Construction
Page 99 Section 007300 Division 00 Special Conditions (Washington State Military Department Supplemental Conditions)
Page 100 Unified Washington Military Department and National Guard Policy No. 10-4 - Spill Response and Reporting
Page 109 Attachment A WMD Environmental Program Office Spill Response Flow Chart
Page 110 Attachment B Spill Incident Report Form
Page 111 Attachment C 194WG Spill Response Flow Chart for Air National Guard Property and Personnel
Page 112 C.2.0.2 Preconstruction Checklist
Page 120 Request for Information
Page 121 Substitution Request Form
Page 123 Form A19-2AE2 Invoice Voucher
Page 124 Form A19-2AE3 Invoice Voucher
Page 125 Application and Certificate for Payment on Contract
Page 128 Certificate for Material Stored on Job Site
Page 129 Construction Field Authorization (FA)
Page 130 Contract Change Order Proposal (COP)
Page 131 Substantial Completion Checklist
Page 132 Certificate of Substantial Completion
Page 133 Final Acceptance Checklist
Page 134 Section 011000 Summary
Page 137 Section 011101 Summary of Hazardous Materials Work
Page 138 Section 011250 Site Specific Conditions
Page 139 Section 012000 Price and Payment Procedures
Page 142 Section 012050 Contract Modification Procedures
Page 144 Section 012300 Alternates
Page 145 Section 012500 Substitution Procedures
Page 148 Section 013000 Administrative Requirements
Page 158 Section 013216 Construction Progress Schedule
Page 160 Section 014000 Quality Requirements
Page 164 Section 014216 Definitions
Page 165 Section 015000 Temporary Facilities and Controls
Page 168 Section 016000 Product Requirements
Page 172 Section 017000 Execution Requirements
Page 178 Section 017419 Construction Waste Management and Disposal
Page 182 Section 017800 Closeout Submittals & Procedures
Page 188 Section 000102 Project Information
Page 189 Section 024100 Demolition
Page 191 Section 054000 Cold-Formed Metal Framing
Page 194 Section 080671 Door Hardware Schedule
Page 196 Section 081213 Hollow Metal Frames
Page 199 Section 081416 Flush Wood Doors
Page 202 Section 087100 Door Hardware
Page 205 Section 092116 Gypsum Board Assemblies
Page 208 Section 096500 Resilient Flooring
Page 211 Section 096813 Tile Carpeting
Page 213 Section 099123 Interior Painting
Page 217 Section 112013 Commercial Equipment, Appliances, and Accessories
Page 219 Section 123200 Manufactured Wood Casework
Page 221 Section 123600 Countertops
Page 224 Section 224000 Plumbing Fixtures
Page 226 Section 233100 HVAC Ducts and Casings
Page 228 Section 260533.16 Boxes for Electrical Systems