This document has 290 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.
Page 1 Cover Page
Page 2 Section 000101 Project Title Page / Approvals
Page 3 Section 000103 Project Directory
Page 5 Section 000110 Table of Contents
Page 8 Section 000115 List of Drawing Sheets
Page 9 Advertisement for Bids
Page 12 Section 001113 Plan Center List
Page 13 Section 003100 Camp Murray Access Requirements
Page 25 Agenda for Pre-Bid Walk-Through
Page 28 Bidding Terms & Conditions
Page 30 Wage Theft Prevention - Responsible Bidder Criteria
Page 32 Section 005100 Supplemental Bidder Responsibility Criteria
Page 34 Form 1 - Contractor Experience Detail
Page 35 Form 2 - Resume of Key Personnel for Proposed Contract
Page 37 Form 5 - Reference Evaluation Questionnaire
Page 38 Form 6 - Supplemental Responsibility Criteria Evaluation Score Sheet
Page 39 A19-2AE2 Invoice Voucher
Page 40 A19-2AE3 Invoice Voucher
Page 41 Application & Certificate for Payment on Contract
Page 42 Certificate for Material Stored on Job Site
Page 43 Instructions to Bidders / General Conditions
Page 55 Section 007200 General Conditions for Washington State Facility Construction
Page 105 Section 007300 Special Conditions
Page 106 Section 007301 Attachment A Spill Response & Reporting
Page 118 Section 011000 Summary
Page 120 Section 012000 Price & Payment Procedures
Page 123 Section 012050 Contract Modification Procedures
Page 125 Request for Equitable Adjustable in Contract Time
Page 128 Section 012500 Substitution Procedures
Page 131 Section 012503 Substitution Request Form
Page 133 Section 013000 Administrative Requirements
Page 142 C.2.0.2 Preconstruction Checklist
Page 150 Facilities Division - Facility Professional Services (FPS) Construction Field Authorization (FA)
Page 151 Facility Professional Services (FPS) Contract Change Order Proposal (COP)
Page 152 Request for Information
Page 153 Construction Progress Meeting Agenda
Page 156 Construction Closeout Meeting Agenda
Page 159 Section 013216 Construction Progress Schedule
Page 162 Section 014000 Quality Requirements
Page 167 Notice of Non-Conformance
Page 168 Section 014100 Regulatory Requirements
Page 170 Section 014200 References
Page 176 Section 014216 Definitions
Page 177 Section 015000 Temporary Facilities & Controls
Page 180 Section 016000 Product Requirements
Page 183 Required Submittals Schedule
Page 184 Section 017000 Execution Requirements
Page 190 Section 017300 Execution for Gas-Line Excavation
Page 191 Section 017419 Construction Waste Management & Disposal
Page 194 Section 017800 Closeout Submittals & Procedures
Page 199 Substantial Completion Checklist
Page 200 Certificate of Substantial Completion
Page 201 Final Completion & Acceptance Checklist
Page 203 Section 024119 Selective Demolition
Page 205 Section 099100 Painting
Page 212 Section 108113 Bird Control Devices
Page 215 Section 133419 Metal Building Systems
Page 233 Section 260126 Maintenance Testing for Electrical Systems
Page 235 Section 260500 Common Work Results for Electrical Systems
Page 241 Section 260519 Low-Voltage Electrical Power Conductors & Cables
Page 244 Section 260526 Grounding & Bonding for Electrical Systems
Page 246 Section 260533 Raceway & Boxes for Electrical Systems
Page 251 Section 262726 Wiring Device
Page 253 Section 265000 Lighting
Page 259 Section 311100 Clearing & Grubbing
Page 263 Section 312000 Earth Moving
Page 274 Section 312335 Excavating Backfilling & Compacting
Page 280 Section 312500 Erosion & Sedimentation Control
Page 282 Section 321313 Concrete Paving
Page 286 Section 334100 Storm Utility Drainage Piping
Page 289 Section 334413 Catch Basins & Cleanouts