Bowerman Airport - Fuel System Replacement and Fuel Apron Rehabilitation, Port of Grays Harbor, WA #2333 - Plans
G0.1 Cover Sheet
G1.1 Site & Survey Control Plan
G2.1 Safety & Phasing Plan - Overview
G2.2 Safety & Phasing Plan - Phase 1
G2.3 Safety & Phasing Plan - Phase 2
G2.4 Safety & Phasing Plan - Phase 3
G2.5 Safety & Phasing Plan - Phase 4
G2.6 Phasing Notes & Details
C0.1 Erosion Control Plan
C1.1 Demolition Plan
C1.2 Demolition Plan
C2.1 Paving Plan
C2.2 Paving Elevation Plan
C2.3 Paving Elevation Plan
C2.4 Paving Details
C2.5 Paving Details
C3.1 Grading Plan
C3.2 Grading Plan
C3.3 Drainage Plan
C3.4 Drainage Details
C4.1 Pavement Marking Plan (Additive Bid 2 Not Awarded)
C4.2 Pavement Marking Plan (Additive Bid 2 Awarded)
C4.3 Pavement Marking Details
E0.1 Electrical Symbol & Legend
E1.1 Electrical Demolition Plan
E2.1 Electrical Site Plan
E3.1 Electrical Grounding Plan
E4.1 Electrical One-Line Diagram & Schedule
E4.2 Electrical Details
E5.1 Electrical Wiring Diagrams
S1.0 Structural Notes
S2.0 Mat Foundation
S2.1 Anchorage Details