Page 1 Cover Page
Page 2 Professional of Record Certification(s)
Page 6 Contract Documents
Page 8 Table of Contents
Page 10 Section I Bidding Information
Page 12 Invitation to Bid
Page 16 Instructions to Bidders
Page 26 Special Provisions
Page 34 Bidder's Checklist
Page 36 Proposal
Page 45 Bid Bond
Page 46 Signature of Bidder
Page 47 Letter of Intent
Page 48 Restriction on Federal Public Works Projects
Page 49 Bidder's Certification
Page 50 Minimum Wage Compliance
Page 51 Buy America Certification
Page 56 Subcontractor
Page 58 Bidders List
Page 59 Bid Bond
Page 60 Appendix
Page 61 Buy America Conformance Listing
Page 62 FAA 5100-136, Buy American Project / Product Content Percentage Calculation - Worksheet
Page 66 Buy American Project / Product Content Percentage Calculation - Worksheet
Page 74 FAA Form 5100-137, Buy American Preferences - Final Assembly Questionnaire
Page 76 Construction Safety & Phasing Plan
Page 108 FAA Airports - Contract Provisions for Obligated Sponsors & Airport Improvement Program Projects
Page 146 Federal Wage Rates
Page 200 Washington State Prevailing Wage Rates - Grays Harbor County
Page 252 Benefit Code Key
Page 270 Section II Contract Forms
Page 272 Agreement
Page 276 Performance Bond
Page 278 Payment Bond
Page 280 Section III Contract Conditions & General Provisions
Page 282 Section 10 Definition of Terms
Page 290 Section 20 Proposal Requirements & Conditions
Page 294 Section 30 Award & Execution of Contract
Page 296 Section 40 Scope of Work
Page 300 Section 50 Control of Work
Page 306 Section 60 Control of Materials
Page 310 Section 70 Legal Regulations & Responsibility to Public
Page 316 Section 80 Execution & Progress
Page 322 Section 90 Measurement & Payment
Page 330 Supplementary Conditions
Page 338 Section IV Technical Specifications
Page 340 Section 010000 General Requirements
Page 344 Section 015500 Airport Safety
Page 348 Section 017123 Construction Staking
Page 352 Section 024116 Structure Demolition
Page 360 Section 026501 Decommissioning of Underground Fuel Storage Tanks
Page 366 Section 260000 Electrical General Provisions
Page 376 Section 260002 Basic Materials & Methods
Page 386 Section 260519 Wire & Cable
Page 392 Section 260526 Grounding
Page 397 Section 260533 Raceways
Page 406 Section 262416 Panelboards
Page 410 Section 262713 Service & Metering
Page 414 Section 262726 Wiring Devices
Page 418 Section 269025 Control Components
Page 422 Item C-100 Contractor Quality Control Program (CQCP)
Page 430 Item C-102 Temporary Air & Water Pollution, Soil Erosion & Siltation Control
Page 434 Item C-105 Mobilization
Page 436 Item D-701 Pipe for Storm Drains & Culverts
Page 444 Item D-751 Manholes, Catch Basins, Inlets & Inspection Holes
Page 449 Item P-101 Preparation / Removal of Existing Pavements
Page 454 Item P-152 Excavation, Subgrade & Embankment
Page 464 Item P-153 Controlled Low-Strength Material (CLSM)
Page 468 Item P-209 Crushed Aggregate Base Course
Page 476 Item P-403 Asphalt Mix Pavement Surface Course
Page 496 Item P-501 Cement Concrete Pavement
Page 528 Item P-603 Emulsified Asphalt Tack Coat
Page 532 Item P-605 Joint Sealants for Pavements
Page 536 Item P-608 Emulsified Asphalt Seal Coat
Page 546 Item P-610 Concrete for Miscellaneous Structures
Page 556 Item P-620 Runway & Taxiway Marking
Page 562 Section V Drawings (Under Separate Cover)