Memorial Flag Triangle Project, City of Des Moines, WA - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 237 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Engineer's Statement
Page 4 General Table of Contents
Page 5 Exhibit A Bid Documents
Page 6 Advertisement for Bids
Page 8 Instructions to Bidders
Page 11 Bidders Checklist
Page 12 Proposal
Page 17 Form of a Bid Bond
Page 18 Non-Collusion Affidavit
Page 19 Statement of Bidder's Qualifications
Page 21 Certification of Non-Segregated Facilities
Page 22 Statement of Proposed Subcontractors & Material Suppliers
Page 23 Local Agency Subcontractor List
Page 24 Certification of Compliance with Wage Payment Statutes
Page 25 Statement of Bidder Responsibility Criteria
Page 26 Exhibit B Contract Documents
Page 27 Contract Checklist
Page 28 Public Works Contract
Page 44 Separate Performance & Payment Bonds
Page 45 Public Works Payment Bond
Page 46 Performance Bond
Page 47 Special Provisions
Page 48 Table of Contents
Page 50 Introduction to the Special Provisions
Page 52 Division 1 General Requirements
Page 96 Division 2 Earthwork
Page 101 Division 4 Bases
Page 102 Division 5 Surface Treatments & Pavements
Page 106 Division 6 Structures
Page 108 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Main & Conduits
Page 109 Division 8 Miscellaneous Construction
Page 139 Division 9 Materials
Page 144 Appendix A Standard Plans
Page 148 Appendix B Prevailing Wages
Page 149 Washington State Prevailing Wage Rates - King County
Page 209 Supplemental to Wage Rates
Page 220 Benefit Code Key