Nisqually State Park - Phase 3A Maintenance Building and Wastewater Treatment Facility, Pierce County, WA #NW-C1218B - Addendum #3 Appendix F - Phase 1 As-Built Plans
G1.0 Cover Sheet
G1.1 Project Team & Notes
G2.0 Survey
D1.0 Demolition & Temporary Erosion & Sediment Control
D1.1 Temporary Erosion & Sediment Control Details
D1.2 TESC Notes and Details
C1.0 Maintenance Building Access Road Plan & Profile
C1.1 Details
C2.0 Site Plan
C2.1 Site Details
C3.0 Grading & Drainage Plan
C3.1 Site Sections
C3.2 Drainage Details
C3.3 Drainage Details
C4.0 Fencing Plan
C4.1 Fencing and Gate Details
C5.0 Borrow Pit
C5.1 Borrow Pit Access Route
L1.0 Topsoil Plan
S0.1 Structural Notes
S0.2 Special Inspections & Schedules
S1.1 Foundation Plan
S5.1 Foundation Details
GI201 General Code Information
AA-100 Project Data
AA-101 Floor & Roof Plans
AA-151 Reflected Ceiling Plan
AA-201 Exterior Elevations
AA-202 Exterior Elevations
AA-251 Interior Elevations
AA-301 Building & Wall Sections
AA-302 Exterior Details
AA-401 Door Schedule
M-001 Legend & Notes
M-002 Schedules & Details
M-101 HVAC Plan
M-201 Elevations
P-001 Legend & Notes
P-101 Foundation Plumbing Plan
E001 Electrical Symbols Legend / Light Fixture Schedule
E002 Lighting Energy Budget Compliance Forms
E101 Overall Electrical Site Plan
E102 Partial Electrical Site Plan
E103 Electrical Site Details
E104 Conduit & Conductor Schedule
E201 Lighting Floor Plan
E301 Power / Signal Floor Plan
E401 Power Riser Diagram / Electrical Schedules
E501 Electrical Details
E502 Electrical Details
E503 Electrical Details