AA1.00 Title Sheet, Sheet Index & General Notes
AA1.10 Overall Building Plans
AA1.30 Existing Condition Photos
AA1.31 Existing Condition Photos
AA1.32 Existing Condition Photos
HZ1.21 Sample Location Drawing - Level 1
HZ1.22 Sample Location Drawing - Level 2
HZ1.23 Sample Location Drawing - Level 3
HZ1.21 Sample Location Drawing - Level 1
HZ1.30 Sample Location Drawing - Roof
A1.10 Site Plan
A1.21 Selective Demolition Plan - Level 1
A1.22 Selective Demolition Plan - Level 2
A1.23 Selective Demolition Plan - Level 3
A1.24 Selective Demolition Plan - Attic Level
A1.30 Selective Demolition Roof Plan
A1.41 Selective Demolition RCP - Level 1
A1.42 Selective Demolition RCP - Level 2
A1.43 Selective Demolition RCP - Level 3
A1.44 Selective Demolition RCP - Attic Level
A2.01 Floor Plan - Level 1
A2.02 Floor Plan - Level 2
A2.03 Floor Plan - Level 3
A2.04 Floor Plan - Attic Level
A2.20 Roof Plan
A2.31 RCP - Level 1
A2.32 RCP - Level 2
A2.33 RCP - Level 3
A2.34 RCP - Attic Level
A2.40 Finish Plan - Level 1
A2.41 Finish Plan - Level 2
A2.42 Finish Plan - Level 3
A2.43 Finish Plan - Attic Level
A2.70 Finish Schedule
A2.73 Typical Assemblies
A4.00 Wall Sections, Wall Assemblies
A4.01 Wall Sections, Wall Assemblies
A5.00 Interior Elevations
A5.01 Interior Elevations
A5.02 Interior Elevations
A5.03 Interior Elevations
A5.10 Interior Elevations - Stairs
A6.20 Exterior Details - Roof, Miscellaneous
A7.10 Interior Details - Walls
A8.00 Casework
S0.01 General Notes
S0.02 General Notes
S2.01 Level 1 Framing Plan
S2.02 Level 2 Framing Plan
S2.03 Level 3 Framing Plan
S2.04 Attic Framing Plan
S2.20 Roof Framing Plan
S3.01 Column Details
S3.02 Column Details
S3.11 Wall Anchorage Details
S3.12 Wall Anchorage Details
S3.21 Parapet Anchorage Details
M0.00 Mechanical & Plumbing Notes & Symbols
M0.01 Plumbing Schedules
M0.02 Existing Conditions - Photos
MD1.21 HVAC Selective Demolition Plan - Level 1
MD1.22 HVAC Selective Demolition Plan - Level 2
MD1.23 HVAC Selective Demolition Plan - Level 3
MD1.24 HVAC Selective Demolition Plan - Attic
M2.03 HVAC Floor Plan - Level 3
PD1.21 Plumbing Selective Demolition Plan - Level 1
PD1.22 Plumbing Selective Demolition Plan - Level 2
P2.01 Plumbing Floor Plan - Level 1
P2.02 Plumbing Floor Plan - Level 2
FP2.01 Level 1 - Fire Protection Plan
FP2.02 Level 2 - Fire Protection Plan
FP2.03 Level 3 - Fire Protection Plan
E0.00 Symbols & Abbreviations
E0.01 Lighting Fixture Schedule
ED2.01 Level 1 Demolition Electrical Floor Plan
ED2.02 Level 2 Demolition Electrical Floor Plan
ED2.03 Level 3 Demolition Electrical Floor Plan
ED2.04 Attic Level Demolition Electrical Floor Plan
ED2.31 Level 1 Demolition Electrical Ceiling Plan
ED2.32 Level 2 Demolition Electrical Ceiling Plan
ED2.33 Level 3 Demolition Electrical Ceiling Plan
ED2.34 Attic Level Demolition Electrical Ceiling Plan
E2.01 Level 1 Electrical Floor Plan
E2.02 Level 2 Electrical Floor Plan
E2.03 Level 3 Electrical Floor Plan
E2.31 Level 1 Electrical Ceiling Plan
E2.32 Level 2 Electrical Ceiling Plan
E2.33 Level 3 Electrical Ceiling Plan