Sandy Cove Park Bank Protection Phase 2, City of Snoqualmie, WA - Plans
G0.00 Cover, Vicinity & Site Map, Sheet Index
G0.01 Legend & Abbreviations
G0.02 General Notes
R1.01 Existing Conditions
R1.02 Existing Conditions
R1.03 Site Plan
C2.01 TESC Plan
C2.02 TESC Plan
C2.03 TESC Details
C2.04 TESC Details
C3.01 Storm Drainage Plan
C3.02 Storm Drainage Profile
C3.03 Storm Drainage Details & Sections
C3.04 Storm Drainage Details & Sections
R2.02 Grading & Wood Plan - West
R2.03 Grading & Wood Plan - East
R2.04 Barb #1 Plan
R2.05 Barb #1 Profile
R2.06 Barb #1 Sections
R2.07 Barb #2 Plan
R2.08 Barb #2 Profile & Sections
R3.01 Vegetated Reinforced Side Slope Details
R3.02 Public Access Ramp Details
R3.03 Public Access Ramp Details
R4.01 Bank Roughening Jam Details
R4.02 Bank Roughening Jam Details
R4.03 Cor Fabric Details
R4.04 Individual Ballast Log Details
L0.01 Tree Protection Plan
L0.02 Tree Protection Plan
L1.00 Planting Schedule
L1.01 Planting Plan
L1.02 Planting Plan
L2.00 Planting Details
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.