124th Ave SE Transit Improvements, City of Auburn, WA #CP2515 - Plans
GT001 Cover Sheet with Vicinity Map & Sheet Index
GN001 General Notes & Abbreviations
VA101 Alignment & Survey Control Plan
VA102 Alignment & Survey Control Plan
CE101 Existing Conditions, TESC & Site Preparation Plan
CE102 Existing Conditions, TESC & Site Preparation Plan
CE103 Existing Conditions, TESC & Site Preparation Plan
CP101 Paving & Restoration Plan
CR101 Raised Bike / Pedestrian Path Plan
CX301 Raised Bike / Pedestrian Path Plan & Roadway Sections
CR501 Raised Bike / Pedestrian Path Ramp, Sidewalk & Bus Shelter Footing Details
CR502 Raised Bike / Pedestrian Path Ramp, Sidewalk & Curb Ramp Details
CR503 Curb Ramp & Center Median Details
CM101 Channelization & Signage Plan
CM102 Channelization & Signage Plan
CM103 Channelization & Signage Plan
TS101 Traffic Signal & Illumination Plan
TS102 Traffic Signal & Illumination Plan
TS103 Traffic Signal & Illumination Plan
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.