Combined Sewer Overflow Pump Station, City of Anacortes, WA #21-025-SEW-003 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 820 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Section 000102 Table of Contents
Page 7 Division 00 Procurement & Contracting Requirements
Page 9 Section 000107 Seals & Signatures
Page 11 Section 001113 Invitation to Bid
Page 13 Section 002113 Instructions to Bidders
Page 25 Section 002114 Bidder's Checklist
Page 27 Section 003500 State of Washington Prevailing Wage Requirements
Page 28 Certification of Compliance with Wage Payment Statutes
Page 29 Section 004113 Bid Form
Page 32 Bid Form for City of Anacortes Combined Sewer Overflow Pump Station
Page 33 Section 004316 Surety Bid Bond Form
Page 35 Section 004400 Information Required of Bidder
Page 41 Section 004410 Subcontractor List
Page 42 Subcontractor Responsibility Checklist
Page 43 Section 005213 Contract
Page 51 Section 006113 Performance Bond
Page 53 Section 006114 Payment Bond
Page 55 Section 006200 Notice of Award Letter
Page 57 Section 006300 Notice to Proceed
Page 59 Section 006400 Notice of Substantial Completion
Page 61 Section 006410 Notice of Final Completion
Page 63 Standard General Conditions
Page 139 Section 007300 Supplementary Conditions to EJCDC Standard General Conditions, C700
Page 157 Division 01 General Requirements
Page 159 Section 011100 Summary of Work
Page 163 Section 011112 Reference Materials
Page 165 Geotechnical Engineering Services
Page 205 Appendix A
Page 206 Groundwater Data Memorandum
Page 235 Section 012200 Measurement & Payment (Unit Price Contracts)
Page 239 Section 012513 Product Substitutions
Page 242 Exhibit A Substitution Request Form (One Item Per Each Form)
Page 243 Section 012973 Schedule of Values
Page 247 Section 012976 Progress Payment Procedures
Page 249 List of Subcontractors & Suppliers
Page 251 Section 013000 Special Conditions
Page 257 Section 013216 Construction Progress Schedule
Page 263 Section 013300 Submittals
Page 270 Exhibit A Shop Drawing Transmittal
Page 271 Exhibit AA Contractor's Submittal Certification
Page 273 Section 013505 Environmental Protection & Special Controls
Page 277 Section 015105 Temporary Utilities
Page 281 Section 015526 Traffic Control
Page 289 Section 016103 Equipment - Basic Requirements
Page 306 Exhibit A Manufacturer Field Service Report
Page 313 Section 016200 Product Options
Page 315 Section 016550 Product Delivery, Storage & Handling
Page 317 Section 017114 Mobilization & Demobilization
Page 319 Section 017123 Field Engineering
Page 325 Section 017320 Openings & Penetrations in Construction
Page 329 Section 017400 Cleaning
Page 333 Section 017500 Checkout & Start-Up Procedures
Page 339 Section 017719 Closeout Requirements
Page 342 Sample Letter for Contractor's Use in Requesting Inspection for Substantial Completion
Page 345 Sample Partial Checklist to Identify Readiness for Final Inspection
Page 349 Sample Letter for Contractor's Use in Requesting Final Inspection
Page 351 Section 017823 Operation & Maintenance Data
Page 361 Attachment 1 Equipment Data & Spare Parts Summary
Page 362 Attachment 2 Recommended Maintenance Summary
Page 363 Attachment 3 Lubrication Summary
Page 365 Section 017839 Project Record Documents
Page 371 Division 02 Existing Conditions
Page 373 Section 024100 Demolition
Page 377 Division 03 Concrete
Page 379 Section 030505 Concrete Testing & Inspection
Page 387 Section 031519 Anchorage to Concrete
Page 395 Section 033130 Concrete, Materials & Proportioning
Page 403 Division 05 Metals
Page 405 Section 055000 Metal Fabrications
Page 421 Division 08 Openings
Page 423 Section 083100 Access Doors
Page 427 Division 09 Finishes
Page 429 Section 098100 Coating for Sewer Pump Station Wet Well
Page 435 Section 099600 High Performance Industrial Coatings
Page 453 Division 10 Specialties
Page 455 Section 101400 Identification Devices
Page 465 Division 26 Electrical
Page 467 Section 260500 Electrical - Basic Requirements
Page 475 Section 260519 Wire & Cable - 600 Volt & Below
Page 485 Section 260526 Grounding & Bonding
Page 491 Section 260533 Raceways & Boxes
Page 505 Section 260543 Electrical - Exterior Underground
Page 513 Section 260548 Electrical Seismic Restraint Systems
Page 519 Section 260813 Acceptance Testing
Page 523 Section 260916 Control Equipment Accessories
Page 531 Section 262413 Switchboards
Page 533 Section 262419 Motor Control Equipment
Page 539 Section 262726 Wiring Devices
Page 543 Section 262800 Overcurrent & Short Circuit Protective Devices
Page 549 Section 262816 Safety Switches
Page 552 Exhibit A Safety Switch Summary Table
Page 553 Section 262923 Variable Frequency Drives - Low Voltage
Page 567 Section 264313 Surge Protection Devices for Low-Voltage Electrical Power Circuits
Page 573 Division 31 Earthwork
Page 575 Section 312300 Earthwork
Page 587 Section 312319 Dewatering
Page 595 Requirements & Checklist for Contaminated Water Discharge
Page 601 Section 312333 Trenching, Backfilling & Compacting for Utilities
Page 607 Section 312500 Erosion & Sedimentation Controls
Page 619 Division 32 Exterior Improvements
Page 621 Section 321216 Asphaltic Concrete Vehicular Paving
Page 623 Section 321613 Concrete Curb & Gutter
Page 625 Section 321623 Concrete Sidewalk & Steps
Page 629 Section 323113 Chain Link Fence & Gates
Page 633 Section 328400 Irrigation System
Page 647 Section 329200 Seeding, Sodding & Landscaping
Page 655 Division 33 Utilities
Page 657 Section 330515 Precast Concrete Utility Structures
Page 663 Section 330516 Precast Concrete Manhole Structures
Page 669 Section 333010 Sewer Bypassing
Page 673 Section 334120 Pipe: Fiberglass Reinforced Polymer Mortar Pipe
Page 681 Division 40 Process Interconnections
Page 683 Section 400500 Pipe & Pipe Fittings - Basic Requirements
Page 695 Section 400507 Pipe Support Systems
Page 701 Section 400519 Pipe - Ductile Iron
Page 705 Section 400531 Pipe - Plastic
Page 707 Section 400551 Valves - Basic Requirements
Page 715 Section 400552 Miscellaneous Valves
Page 719 Section 400561 Gate Valves
Page 721 Section 400562 Plug Valves
Page 723 Section 400566 Check Valves
Page 727 Section 406113 Process Control System General Requirements
Page 733 Loop Check-Out Sheet
Page 734 Instrument Certification Sheet
Page 735 Final Control Element Certification Sheet
Page 737 Section 406121 Process Control System Testing
Page 743 Section 406196 Process Control Descriptions
Page 748 Appendix A CSO Pump Station Process Control Description
Page 753 Section 406343 Programmable Logic Controllers
Page 763 Section 406605 Network Equipment
Page 767 Section 406700 Control System Equipment Panels & Racks
Page 779 Section 406863 Configuration of HMI Software & Reports
Page 789 Section 407100 Flow Instrumentation
Page 793 Section 407200 Level Instrumentation
Page 797 Section 407800 Panel Mounted Instruments
Page 805 Division 43 Process Gas & Liquid Handling, Purification & Storage Equipment
Page 807 Section 432100 Pumping Equipment - Basic Requirements
Page 811 Section 432513 Pumping Equipment - Submersible End-Suction Sewage Pumps
Page 817 Section 432519 Overhung Submersible Centrifugal Sump Pumps