Smokey Point Blvd &180th Street Roundabout, City of Arlington, WA #T26.002 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 426 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 3 Part I General Information
Page 4 Advertisement for Bid
Page 8 Part II Bid Proposal
Page 9 Bidders Checklist
Page 10 Statement of Bidder's Qualifications
Page 12 Bidder Questionnaire
Page 14 Local Agency Subcontractor List
Page 15 Proposal Form
Page 18 Non-Collusion Declaration
Page 19 Bid Schedule
Page 24 Deposit or Bid Bond Form
Page 25 Certification of Compliance with Wage Payment Statutes
Page 26 Part III Contract
Page 27 Contract Checklist
Page 28 Construction Contract
Page 39 Exhibit A Scope of Work
Page 40 Exhibit B Federally Funded Construction Projects
Page 41 Contract Provisions for Federal-Aid Construction Contracts
Page 53 Performance Bond
Page 54 Payment Bond
Page 55 Part V Special Provisions
Page 56 Introduction to the Special Provisions
Page 57 Division 1 General Requirements
Page 120 Division 2 Temporary Features
Page 126 Division 3 Earthwork
Page 129 Division 5 Surface Treatments & Pavements
Page 159 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduit
Page 177 Division 8 Miscellaneous Construction
Page 195 Division 9 Materials
Page 200 Appendix A Washington State Prevailing Wage for Snohomish County, Labor & Industries Policy Statement, Labor & Industries Benefit Codes
Page 201 Washington State Prevailing Wage Rates - Snohomish County
Page 249 Supplemental to Wage Rates
Page 260 Benefit Code Key
Page 281 Appendix B Standard Plans / Details
Page 331 Appendix C Geotechnical Report