This document has 563 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.
Page 1 Cover Page
Page 3 Table of Contents
Page 6 Notices
Page 7 Bidder's Responsibility
Page 8 Advertisement for Bids
Page 10 Instructions to Bidders
Page 12 Forms and Certificates
Page 13 Noncollusion Certificate
Page 15 Bidder's Qualification Certificate
Page 18 Subcontractor List
Page 20 Bidder Questionnaire
Page 22 Bidder's Affidavit of Equal Opportunity Compliance
Page 26 Bidder's Affidavit of Title VI Compliance
Page 29 Wage Payment Compliance Certification
Page 30 Bid Bond Form
Page 31 Proposal / Construction Contract
Page 39 Lobbying Certification
Page 40 Disadvantaged Business Enterprise Utilization Certification
Page 42 Example Disadvantaged Business Enterprise Utilization Certification
Page 43 Disadvantaged Business Enterprise (DBE) Written Confirmation Document
Page 44 Disadvantaged Business Enterprise (DBE) Bid Item Breakdown Form
Page 46 Disadvantaged Business Enterprise (DBE) Trucking Credit Form
Page 48 Proposal for Incorporating Recycled Materials into the Project
Page 49 Performance Bond
Page 53 Payment Bond
Page 57 Agreement
Page 59 Required Contract Provisions Federal-Aid Construction Contracts
Page 74 Special Provisions
Page 75 Introduction to the Special Provisions
Page 77 Division 1 General Requirements
Page 142 Division 2 Earthwork
Page 147 Division 4 Bases
Page 148 Division 5 Surface Treatments and Pavements
Page 161 Division 6 Structures
Page 162 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits
Page 170 Division 8 Miscellaneous Construction
Page 220 Appendices
Page 221 Appendix A Standard Drawings
Page 317 Appendix B Wage Rates
Page 318 Washington State Prevailing Wage Rates - King County
Page 366 Benefit Code Key
Page 384 Federal Wage Determinations
Page 441 Appendix C Telephone Numbers
Page 450 Appendix D Permits
Page 474 Appendix E Property Commitments
Page 476 Appendix F Construction Stormwater Pollution Prevention Plan (CSWPPP)
Page 559 Appendix G List of Law Enforcement Agencies with Authorized Police Powers