Flooring Installation Services (Federal), Seattle Housing Authority, Seattle, WA #6067 - Volume 2 General Requirements & Technical Specs

Order Prints   FastBid Help

This document has 103 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 3 Volume 2 General Requirements & Technical Specifications
Page 4 Section 010100 General Description
Page 16 Section 011000 Summary of Work
Page 30 Section 011120 Contract Requirements
Page 33 Section 011400 Work Restrictions
Page 35 Section 012500 Contract Modification Procedures
Page 38 Section 012600 Applicable Codes & Standards
Page 41 Section 012900 Payment Procedures
Page 45 Section 013100 Project Management & Coordination
Page 53 Section 013200 Construction Progress Documentation
Page 60 Section 013300 Submittal Procedures
Page 67 Section 013500 Substitutions
Page 69 Section 015000 Temporary Facilities & Controls
Page 74 Section 016000 Materials & Equipment
Page 77 Section 016510 Delivery, Storage & Handling
Page 81 Section 017310 Cutting & Patching
Page 84 Section 017400 Cleaning
Page 86 Section 017700 Closeout Procedures
Page 91 Section 017820 Operation & Maintenance Data
Page 96 Division 01 Sample Forms
Page 97 Daily Construction Quality Control Report (Sample Form)
Page 98 Request for Information (Sample Form)
Page 99 Request for Substitution (Sample Form)
Page 101 Certification of Equal Performance & Assumption of Liability for Equal Performance
Page 102 Submittal Cover Sheet (Sample Form)
Page 103 Volume 3 Technical Standards (Under Separate Cover)