Everett Station - HVAC and Controls Improvements, City of Everett, WA #24-3201 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 571 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Section 000001 Contact List
Page 3 Section 000110 Table of Contents
Page 6 Section 001113 Advertisement for Bids
Page 8 Section 002113 Instructions to Bidders
Page 23 Section 002213 Supplemental Instructions to Bidders
Page 26 Section 002513 Pre-Bid Meeting
Page 28 Section 004113 Bid Form (Lump Sum)
Page 34 Section 004313 Bid Security Form
Page 38 Section 004336 Subcontractor Identification Form
Page 40 Section 004513 Bidder Qualification Statement
Page 44 Section 004519 Non-Collusion Affidavit
Page 45 Section 004539 RCW 35.22.650 Certification
Page 47 Section 005213 Agreement Form
Page 53 Section 006113 Performance Bond & Payment Bond / Performance Bond
Page 54 Payment Bond
Page 55 Section 006123 New Retainage Bond
Page 58 Section 006125 Retainage Escrow Agreement
Page 62 Exhibit A City Supplied Information
Page 64 Section 006325 Substitution Request Form
Page 66 Section 006363 Change Order - Agreed
Page 69 Exhibit A Description of Changed Work
Page 70 Section 006365 Change Order - Unilateral
Page 73 Exhibit A Description of Changed Work
Page 74 Section 006519 Certificate of Completion Form
Page 77 Section 007200 General Conditions
Page 143 Section 007300 Special Conditions
Page 145 Section 007343 Wage Rate Requirements
Page 147 Section 007373 Apprentice Utilization & Reporting
Page 151 Section 011100 Summary of Work
Page 153 Section 012500 Substitution Procedures
Page 158 Section 012600 Contract Modification Procedures
Page 160 Section 012602 Request for Information
Page 161 Section 012900 Payment Procedures
Page 163 Section 012973 Schedule of Values
Page 168 Section 013113 Project Coordination
Page 169 Section 013119 Project Meetings
Page 173 Section 013216 Construction Progress Schedule
Page 175 Section 013300 Submittal Procedures
Page 177 Section 013529 Health & Safety
Page 180 Section 013544 Hazardous Materials Procedures
Page 182 Section 013553 Security Procedures
Page 183 Section 014200 References
Page 189 Section 014500 Quality Control
Page 194 Section 014523 Testing & Inspection Services
Page 202 Section 015000 Temporary Facilities & Controls
Page 204 Section 015500 Vehicle Access & Parking
Page 220 Section 015700 Temporary Controls
Page 227 Section 017229 Cutting & Patching
Page 234 Section 017419 Construction Waste Management & Disposal
Page 240 Section 017423 Final Cleaning
Page 242 Section 017700 Closeout Procedures
Page 246 Substantial Completion
Page 248 Physical Completion
Page 249 Section 017823 Operation & Maintenance Data
Page 253 Section 017836 Warranties & Bonds
Page 255 Section 017839 Project Record Documents
Page 258 Section 075330 Elastomeric Sheet Roofing / Mechanically Attached
Page 264 Section 095100 Acoustical Ceiling Systems
Page 267 Section 099000 Painting
Page 272 Section 200200 Operation & Maintenance Manual for Mechanical
Page 274 Section 200500 Common Work Results for Mechanical
Page 299 Section 200503 Existing Systems Work for Mechanical
Page 304 Section 200519 Piping Specialties for Mechanical
Page 309 Section 200529 Hangers & Supports for Mechanical
Page 318 Section 200530 Sleeves & Seals for Mechanical
Page 326 Section 200548 Vibration & Seismic Controls for Mechanical
Page 333 Section 200593 Testing, Adjusting, Balancing for Mechanical
Page 341 Section 200700 Mechanical Insulation
Page 352 Section 200800 Commissioning of Mechanical
Page 356 Section 221100 Facility Water Distribution
Page 365 Section 224000 Plumbing Fixtures
Page 368 Section 232113 Hydronic Piping
Page 376 Section 232128 HVAC Condensate Piping
Page 381 Section 232300 Refrigerant Piping
Page 385 Section 233100 HVAC Ducts & Casings
Page 394 Section 233300 Duct Accessories
Page 402 Section 233400 Fans
Page 407 Section 233600 Air Terminal Units
Page 411 Section 233700 Air Outlets & Inlets
Page 415 Section 237223 Energy Recovery Ventilator
Page 419 Section 237300 Air Handling Units
Page 427 Section 238144 Air-Source Split System Heat Pumps
Page 434 Section 255000 Integrated Automation Facility Controls
Page 459 Section 259000 Integrated Automation Control Sequence
Page 469 Section 260100 Electrical General Requirements
Page 478 Section 260400 Existing Electrical Systems
Page 482 Section 260500 Basic Materials & Methods
Page 490 Section 260526 Grounding & Bonding
Page 492 Section 262000 Electrical Distribution
Page 497 Section 283100 Addressable Fire Alarm System
Page 502 Appendix A 2025 FTA Clauses & Certification Forms
Page 503 Federal Transit Administration Clauses
Page 543 Certificate of Non-Debarment / Suspension
Page 544 Certification Regarding Lobbying by Contractor
Page 545 Disclosure of Lobbying Activities
Page 548 Certification Regarding Conflict of Interest
Page 549 Buy America Certification (FTA)
Page 550 Contractor & Subcontractor Bidder Information Form
Page 551 Appendix B Limited Hazardous Materials Survey