Gilman Well Facility Upgrade Project, City of Issaquah, WA #WT045 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 131 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Table of Contents
Page 4 Part I Contract Documents - Advertisement for Bids
Page 6 Instructions to Bidders
Page 8 Declaration of Option for Management of Statutory Retained Percentage Public Works Contract
Page 10 Public Works Contract
Page 13 Contract Bond (Performance & Payment) / Public Works Performance Bond
Page 15 Public Works Payment Bond
Page 17 Bidder's Checklist
Page 18 Statement of Bidder's Qualifications
Page 20 Subcontractor List
Page 21 Non-Collusion & Debarment Declaration
Page 22 Proposal
Page 27 Proposal Signature Sheet
Page 28 Authority Affirmation Statement
Page 30 Wage Law Form
Page 31 Bid Bond
Page 32 Certification Regarding Lobbying
Page 33 Part II Introduction to the Special Provisions
Page 34 Division 1 General Requirements
Page 85 Division 2 Earthwork
Page 88 Division 3 Aggregate Production & Acceptance
Page 89 Division 4 Bases
Page 90 Division 5 Surface Treatments & Pavements
Page 91 Division 6 Structures
Page 92 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 106 Division 8 Miscellaneous Construction
Page 112 Division 9 Materials
Page 113 Appendix A State Wage Rates
Page 114 Appendix B Drawings (Under Separate Cover)
Page 115 Appendix C II to Part 200 - Contract Provisions for Non-Federal Entity Contracts Under Federal Awards
Page 119 Appendix D DBRA Requirements for Contracts in Excess of $100,000 Under EPA Grants
Page 122 Appendix E EPA Items
Page 125 Appendix F BABA Compliance
Page 126 Appendix G 40 CFR Part 33 Subpart C
Page 130 Appendix H Permits & Licenses (Shoreline Substantial Development & Consolidated Capital Permit)