Temporary Regional Booster Pump Station - Highlands Temporary Regional Booster Pump Station, City of Kirkland, WA #02-26-PW - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 348 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Section 000001 Table of Contents
Page 10 Section 000002 Approved for Construction
Page 11 Section 000003 Certificate of Architect / Engineer
Page 12 Section 000010 Invitation for Bids
Page 16 Section 001010 Bidder's Checklist
Page 18 Section 001020 Bidder's Qualifications
Page 20 Section 001530 Bidder's Responsibility Criteria
Page 24 Section 001540 Bidder's Certification
Page 26 Section 002000 Instructions to Bidders
Page 31 Section 003000 Information Available to Bidders
Page 32 Section 004100 Bid Form
Page 37 Section 004330 Bid Deposit
Page 38 Section 004400 Subcontractor Identification
Page 41 Section 004570 Retainage Investment Option
Page 43 Section 005220 Agreement Form
Page 47 Section 006000 Bonds & Certificates
Page 52 Section 006140 Performance Bond
Page 53 Section 006141 Payment Bond
Page 55 Section 007000 General Conditions
Page 78 Section 008275 Contractor's Affidavit of Release
Page 80 Section 008300 Department of Labor Wage Rates
Page 81 Division 01 General Requirements
Page 82 Section 011000 Summary
Page 86 Section 012200 Unit Prices
Page 88 Section 012600 Contract Modification Procedures
Page 92 Section 012900 Payment Procedures
Page 97 Section 013100 Project Management & Coordination
Page 103 Section 013200 Construction Progress Documentation
Page 110 Section 013233 Photographic Documentation & Video Services
Page 112 Section 013300 Submittal Procedures
Page 121 Section 014000 Quality Requirements
Page 125 Section 014100 Regulatory Requirements
Page 128 Section 014200 References
Page 136 Section 015000 Temporary Facilities & Controls
Page 143 Section 015526 Traffic Control
Page 145 Section 016000 Product Requirements
Page 153 Section 016100 Substitution Request Form
Page 155 Section 017300 Execution
Page 162 Section 017329 Cutting & Patching
Page 166 Section 017419 Construction Waste Management & Disposal
Page 171 Section 017700 Closeout Procedures
Page 180 Section 017836 Warranties
Page 183 Warranty Repair Request
Page 184 Technical Specifications
Page 185 Table of Contents
Page 191 Division 1 General
Page 196 Division 2 Sitework
Page 219 Division 3 Concrete
Page 237 Division 4 Masonry (This Division Not Used)
Page 238 Division 5 Metals
Page 241 Division 6 Wood, Plastics & Composites (This Division Not Used)
Page 242 Division 7 Thermal & Moisture Protection
Page 245 Division 8 Openings
Page 247 Division 9 Finishes
Page 255 Division 10 Specialties
Page 257 Division 11 Equipment
Page 260 Division 12 Furnishings (This Division is Not Used)
Page 261 Division 13 Special Construction
Page 263 Division 14 Conveying Systems (This Division is Not Used)
Page 264 Division 15 Mechanical
Page 278 Division 16 Electrical
Page 308 Division 17 Automatic Control (This Division is Not Used)
Page 309 Division 18 Measurement & Payment
Page 313 Appendix A Temporary Regional Booster Pump Station Valve Vault Soil Investigation Technical Memorandum
Page 317 Appendix B Pump System Pre-Purchase
Page 338 Appendix C Check Valve Stations Specs - Bid - Available Upon Request
Page 339 Appendix D Meter Socket Catalog Numbers