Shoultes Elementary School - 51st Avenue NE Improvements, City of Marysville, WA #D2301 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 210 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 4 Part 1 Project & Bidding Information
Page 5 Call for Bids
Page 7 Information for Bidders
Page 9 Bidder's Checklist
Page 10 Part 2 Bid Proposal Documents
Page 11 Statement of Bidder's Qualifications
Page 13 List of Subcontractors (Contracts Estimated to Cost Over $1,000,000.00)
Page 14 List of Subcontractors (All Contracts)
Page 15 Bid Proposal Form
Page 17 Bid Schedule
Page 22 Proof of Authority to Sign Bid
Page 24 Bid Deposit
Page 25 Deposit or Bid Bond Form
Page 26 Certification of Compliance with Wage Payment Statutes
Page 27 Part 3 Contract Documents
Page 28 Public Works Contract
Page 32 Performance Bond
Page 33 Payment Bond
Page 34 Contractor's Declaration of Option for Management of Statutory Retained Percentage
Page 35 Assignment of Savings or Time Deposit Escrow Retained Percentage Holding Account
Page 36 Retainage Escrow Agreement & Instructions
Page 41 Retainage Bond
Page 43 Part 4 Prevailing Wage Rates
Page 44 Part 5 Department of Ecology Special Provisions
Page 47 Part 6 Special Provisions
Page 48 Introduction to the Special Provisions
Page 49 Division 1 General Requirements
Page 109 Division 2 Earthwork
Page 120 Division 3 Aggregate Production & Acceptance
Page 121 Division 4 Bases
Page 125 Division 5 Surface Treatments & Pavements
Page 153 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 163 Division 8 Miscellaneous Construction
Page 182 Division 9 Materials
Page 191 Appendix A Soil Logs
Page 209 Appendix B Project Sign Example