Cast Iron Main Replacement Phase 2, Silver Lake Water & Sewer District, Snohomish County, WA #24-0003 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 438 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Table of Contents
Page 5 Part I Call for Bids
Page 9 Part II Instructions to Bidders
Page 19 Part III Bid Documents
Page 21 Bid Submittal Checklist
Page 23 Bid Proposal
Page 29 Bidder Responsibility Criteria
Page 31 Statement of Bidder's Qualifications
Page 33 Non-Collusion Declaration
Page 35 Bid Bond
Page 37 Subcontractor List
Page 39 Part IV Award Documents
Page 41 Contract Agreement
Page 43 Public Works Payment Bond
Page 45 Performance Bond
Page 47 Declaration of Option for Management of Statutory Retained Percentage
Page 49 Part V General Conditions of the Contract
Page 93 Part VI Project Special Provisions
Page 95 Table of Contents
Page 99 Division 1 General Requirements
Page 105 Division 2 Earthwork
Page 115 Division 4 Bases
Page 117 Division 5 Surface Treatments & Pavements
Page 143 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 177 Division 8 Miscellaneous Construction
Page 193 Division 9 Materials
Page 207 Part VII Appendices
Page 209 Appendix A Reports
Page 211 Geotechnical Report
Page 247 Critical Areas Study
Page 423 Appendix B Permits
Page 435 Appendix C Example Traffic Control Plans