Transmission Main Seismic Valves Installation - Bid Package 1 (Rebid), City of Olympia, WA #PRJ-24-000221 - Plans
Cover Sheet
G-1 Sheet Index & Project Information
G-2 Project Map
G-3 Transmission Main System Profile
G-4 Abbreviations, General Symbols, Symbol Legend & Number System
G-5 Survey Control Point Table
G-6 Survey Control - Sites 2, 3, & 6
G-7 Temporary Drain Plans - Sites 2 & 3
G-8 Temporary Drain Plan - Site 6
C2-1 Site 2 Pacific Avenue West of I-5 - Existing Site Demolition Plan
C2-2 Site 2 Pacific Avenue West of I-5 - Proposed Site Plan
C3-1 Site 3 Pacific Avenue East of I-5 - Existing Site Demolition Plan
C3-2 Site 3 Pacific Avenue East of I-5 - Proposed Site Plan
C6-1 Site 6 Pacific Avenue SE & Bismark Lane - Existing Site Demolition Plan
C6-2 Site 6 Pacific Avenue SE & Bismark Lane - Proposed Site Plan
C11-1 Site 11 Meridian Reservoirs Site Outlet - Existing Site Demolition Plan
C11-2 Site 11 Meridian Reservoirs Site Outlet - Proposed Site Plan
CD-1 Erosion Control Details & Notes
CD-2 Sites 2, 3 & 11 City of Olympia Trench & Restoration Details
CD-3 Site 2 Traffic Island Demolition Plan, Section & Photo
CD-4 Site 2 Proposed Traffic Island Repair Plan & Section
CD-5 Site 3 Transmission Main Air Release Valve Demolition Plan, Proposed Plan, Sections & Photo
CD-6 Sites 2 & 3 City of Olympia Water & Striping Details
CD-7 Site 6 City of Lacey Trench & Restoration Details
CD-8 Site 6 Transmission Main Demolition Plan, Section & Details
CD-9 Site 6 Buried Valve Drain Ports Plan & Section
TC-1 Site 2 Traffic Control Plan
TC-2 Site 3 2-Lane Traffic Control Plan
TC-3 Site 3 3-Lane Traffic Control Plan
TC-4 Site 6 Traffic Control Plan
M-1 Pipe Symbols & Process
M2-1 Site 2 - Demolition Existing Valve Vault Plan & Sections
M2-2 Site 2 - Existing Valve Vault Modifications Plan & Sections
M3-1 Site 3 - Demolition Existing Valve Vault Plan & Sections
M3-2 Site 3 - Existing Valve Vault Modifications Plan & Sections
M11-1 Site 11 - Demolition Existing Valve Vault Plan & Sections
M11-2 Site 11 - Existing Valve Vault Modifications Plan & Sections
E-1 Electrical Symbols, Abbreviations, General Notes, Tag List, Sheet List & Work Summary
E-2 Electrical Details
E2-1 Site 2 Electrical Plan, Valve Vault Plan, One-Line Diagram & Tag List
E2-2 Panelboard (02 PB 01)
E2-3 Control Panel Elevations
E2-4 Control Panel (O2 CP 02) Elementary Wiring Diagram
E2-5 Control Panel (02 CP 02) Elementary Wiring Diagram & (02 MOV 01) Connection Diagram
E2-6 (02 PLC 01) I/O Tables & Site 02 Cable & Conduit Schedules
E3-1 Site 3 Electrical Plan, Valve Vault Plan, One-Line Diagram & Tag List
E3-2 Panelboard (03 PB 01)
E3-3 Control Panel Elevations
E3-4 Control Panel (03 CP 02) Elementary Wiring Diagram
E3-5 Control Panel (03 CP 02) Elementary Wiring Diagram & (03 MOV 01) Connection Diagram
E3-6 (03 PLC 01) IO Tables & Site 03 Cable & Conduit Schedules
E11-1 Site 11 Electrical Plan, Valve Vault Plan & Tag List
E11-2 Valve House Electrical Plan & (11 MOV 01) Connection Diagram
E11-3 (11 PLC 01) New & Modified IO Tables & Site 11 Cable & Conduit Schedules
E14-1 Site 14 McAllister Wellfield PW-25 Operations Building Modified Electrical Plan