Lawrence Street Multimodal Improvements, City of Port Townsend, WA - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 332 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Bid Document Cover Sheet
Page 4 Table of Contents
Page 5 Part 1 Bid Forms
Page 6 Invitation to Bid
Page 7 Instructions for Bidders
Page 11 Exhibit A Local Agency Proposal - Signature Page
Page 12 Exhibit B Bid Tabulation Form
Page 17 Exhibit C Local Agency Subcontractor List
Page 18 Exhibit D Non-Collusion Declaration
Page 19 Exhibit E Local Agency Proposal Bond
Page 20 Exhibit F Wage Law Compliance - Responsibility Criteria
Page 21 Exhibit G Not Used
Page 22 Part 2 Contract Forms
Page 23 Exhibit H Local Agency Contract
Page 25 Exhibit I Public Works Performance Bond
Page 26 Exhibit J Public Works Payment Bond
Page 27 Exhibit K Title VI Non-Discrimination Assurances
Page 28 Part 3 Special Provisions
Page 29 Contents
Page 35 Division 1 General Requirements
Page 68 Division 2 Temporary Features
Page 75 Division 3 Earthwork
Page 78 Division 4 Aggregates & Bases
Page 84 Division 5 Surface Treatments & Pavements
Page 110 Division 6 Structures
Page 113 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 118 Division 8 Miscellaneous Construction
Page 132 Division 9 Materials
Page 144 Appendix A Summary of Earth Quantities
Page 149 Appendix B Tree Preservation Plan - Landmark Live Oak, 1520 Lawrence Street
Page 167 Appendix C Nyloplast Drain Basin with Dome Grate
Page 168 Appendix D Rights of Entry
Page 172 Appendix E Instructions for Transfer of Coverage Construction Stormwater General Permit
Page 180 Part 4 Appendices
Page 181 Appendix A Prevailing Wages
Page 182 Appendix A.1 Washington State Prevailing Wage Rates - Jefferson County
Page 230 Appendix A.2 Benefit Code Key
Page 248 Appendix A.3 Supplemental to Wage Rates
Page 259 Appendix B Plans