Interstate 5 Port of Tacoma Road Interchange Phase 2A, City of Fife, WA - Volume 2 Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 2596 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Part 2 Contract Specifications
Page 3 Table of Contents
Page 6 Introduction to the Special Provisions
Page 7 Division 1 General Requirements
Page 129 Division 2 Earthwork
Page 152 Division 5 Surface Treatments & Pavements
Page 158 Division 6 Structures
Page 179 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 195 Division 8 Miscellaneous Construction
Page 306 Division 9 Materials
Page 346 Appendices
Page 356 Part 3 Appendices
Page 357 Appendix A Geotechnical Engineering Services Final Report
Page 753 Appendix B Permits
Page 779 Appendix C Existing Port of Tacoma Road Bridge Plans
Page 806 Appendix D Utility Standards
Page 969 Appendix E Estimate of Remedial Mass Recovery Technical Memorandum Regarding Contaminated Soils
Page 996 Appendix F Standard Plans
Page 1163 Appendix G Potholing Information
Page 1252 Appendix H SWPPP Narrative
Page 1386 Appendix I Hydraulic (Drainage) Report
Page 2388 Appendix J Utility Relocation Plans
Page 2398 Appendix K Existing Wall Plans
Page 2441 Appendix L Soil Sampling Letter Report
Page 2536 Appendix M Department of Ecology Letter
Page 2555 Appendix N Public Interest Finding (PIF)
Page 2568 Appendix O Good Faith Survey