Interstate 5 Port of Tacoma Road Interchange Phase 2A, City of Fife, WA - Addendum #5 Volume 2 Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 2597 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Table of Contents
Page 6 Introduction to the Special Provisions
Page 7 Division 1 General Requirements
Page 129 Division 2 Earthwork
Page 153 Division 5 Surface Treatments and Pavements
Page 159 Division 6 Structures
Page 180 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits
Page 196 Division 8 Miscellaneous Construction
Page 307 Division 9 Materials
Page 357 Part 3 Appendices
Page 358 Appendix A Geotechnical Engineering Services Final Report
Page 754 Appendix B Permits
Page 780 Appendix C Existing Port of Tacoma Road Bridge Plans
Page 807 Appendix D Utility Standards
Page 970 Appendix E Estimate of Remedial Mass Recovery Tech Memo Regarding Contaminated Soils
Page 997 Appendix F Standard Plans
Page 1164 Appendix G Potholing Information
Page 1253 Appendix H SWPPP Narrative
Page 1387 Appendix I Hydraulic (Drainage) Report
Page 2389 Appendix J Utility Relocation Plans
Page 2399 Appendix K Existing Wall Plans
Page 2442 Appendix L Soil Sampling Letter Report
Page 2537 Appendix M Department of Ecology Letter
Page 2556 Appendix N Public Interest Finding (PIF)
Page 2569 Appendix O Good Faith Survey