Interstate 5 Port of Tacoma Road Interchange - Phase 2A, City of Fife, WA - Addendum #2 Volume 2 Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 2593 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Part 2 Contract Specifications
Page 3 Table of Contents
Page 6 Introduction to the Special Provisions
Page 7 Division 1 General Requirements
Page 115 Division 2 Earthwork
Page 139 Division 5 Surface Treatments and Pavements
Page 145 Division 6 Structures
Page 166 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits
Page 182 Division 8 Miscellaneous Construction
Page 295 Division 9 Materials
Page 335 Appendices
Page 347 Part 3 Appendices
Page 348 Appendix A Geotechnical Engineering Services Final Report
Page 744 Appendix B Permits
Page 771 Appendix C Existing Port of Tacoma Road Bridge Plans
Page 798 Appendix D Utility Standards
Page 961 Appendix E Estimate of Remedial Mass Recovery Tech Memo Regarding Contaminated Soils
Page 988 Appendix F Standard Plans
Page 1155 Appendix G Potholing Information
Page 1244 Appendix H SWPPP Narrative
Page 1378 Appendix I Hydraulic (Drainage) Report
Page 2380 Appendix J Utility Relocation Plans
Page 2390 Appendix K Existing Wall Plans
Page 2433 Appendix L Soil Sampling Letter Report
Page 2528 Appendix M Department of Ecology Letter
Page 2547 Appendix N Public Interest Finding (PIF)
Page 2560 Appendix O Good Faith Survey
Page 2589 Appendix P Landscape Maintenance Bond