Interstate 5 Port of Tacoma Road Interchange - Phase 2A, City of Fife, WA - Addendum #1 Volume 2 Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 2599 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Part 2 Contract Specifications
Page 3 Table of Contents
Page 5 Introduction to the Special Provisions
Page 6 Division 1 General Requirements
Page 118 Division 2
Page 143 Division 5 Surface Treatments and Pavements
Page 149 Division 6 Structures
Page 170 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits
Page 186 Division 8 Miscellaneous Construction
Page 299 Division 9 Materials
Page 340 Appendices
Page 341 Standard Plans
Page 353 Part 3 Appendices
Page 354 Appendix A Geotechnical Engineering Services Final Report
Page 750 Appendix B Permits
Page 777 Appendix C Existing Port of Tacoma Road Bridge Plans
Page 804 Appendix D Utility Standards
Page 967 Appendix E Estimate of Remedial Mass Recovery Tech Memo Regarding Contaminated Soils
Page 994 Appendix F Standard Plans
Page 1161 Appendix G Potholing Information
Page 1250 Appendix H SWPPP Narrative
Page 1384 Appendix I Hydraulic (Drainage) Report
Page 2386 Appendix J Utility Relocation Plans
Page 2396 Appendix K Existing Wall Plans
Page 2439 Appendix L Soil Sampling Letter Report
Page 2534 Appendix M Department of Ecology Letter
Page 2553 Appendix N Public Interest Finding (PIF)
Page 2566 Appendix O Good Faith Survey
Page 2595 Appendix P Landscape Maintenance Bond