Pump Station 30 Improvements, City of Shoreline, WA #1275307 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 669 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Certificate Page
Page 3 Table of Contents
Page 4 Section I Notice of Invitation for Bids
Page 7 Section II General Terms & Conditions & Instructions to Bidders & Bidder's Checklist
Page 14 Section III Bid Documents
Page 15 Bid Proposal Form
Page 19 Bid Bond
Page 20 Contractor Certification of Wage Law Compliance
Page 21 Local Agency Subcontractor List
Page 22 Statement of Bidder Responsibility
Page 24 Section IV Award Documents
Page 25 Agreement
Page 28 Contract Bond
Page 29 Retainage Instructions Mandatory Form
Page 30 Retainage Bond
Page 31 Apprentice Utilization Plan
Page 32 Good Faith Effort Reduction of Apprentice Utilization Requirement
Page 34 Section V Special Provisions
Page 35 Table of Contents
Page 39 Introduction to the Special Provisions
Page 40 Division 1 General Requirements
Page 108 Section VI Technical Specifications
Page 109 Table of Contents
Page 111 Section 01010 Summary of Work
Page 115 Section 01011 Definitions
Page 117 Section 01014 Temporary Bypassing
Page 123 Section 01095 Standard Specifications
Page 125 Section 01340 Project Data Submittals
Page 129 Section 01410 Testing & Quality Control
Page 131 Section 01561 Construction Cleaning
Page 133 Section 01620 Protection of Materials & Equipment
Page 135 Section 01630 Product Options & Substitutions
Page 137 Section 01660 Facility Startup & Testing
Page 141 Section 01665 Facility Training
Page 143 Section 01730 Operation & Maintenance Data
Page 147 Section 02100 Site Preparation
Page 149 Section 02160 Excavation Support Systems
Page 153 Section 02220 Earthwork
Page 163 Section 02510 Asphalt Concrete Paving
Page 167 Section 02650 Buried Piping Systems
Page 169 Section 02735 Utility Structures
Page 175 Section 02740 Stormwater Treatment Systems
Page 181 Section 02910 Soil Preparation
Page 197 Section 02920 Seeding
Page 208 Section 02930 Planting
Page 228 Section 03002 Concrete, Reinforcing Steel & Grouts
Page 252 Section 05500 Metal Fabrications
Page 258 Section 06619 Fiberglass Reinforced Plastic Ladders
Page 262 Section 07725 Equipment Hatches
Page 264 Section 07900 Sealants & Caulking
Page 274 Section 09900 Paint Coating Systems
Page 284 Section 10400 Identifying Devices
Page 288 Section 11010 Equipment General Provisions
Page 298 Section 11310 Submersible Non-Clog Pumps
Page 308 Section 15010 Mechanical General Provisions
Page 314 Section 15060 Pipe
Page 322 Section 15065 Piping Systems
Page 328 Section 15066 Pipe Support Systems
Page 332 Section 15070 Piping Appurtenances
Page 338 Section 15100 Valves
Page 342 Section 15250 Pressure Gauges
Page 344 Section 16010 Electrical General
Page 354 Section 16011 Electrical Demolition
Page 356 Section 16110 Electrical Raceways
Page 368 Section 16120 Wire & Cable
Page 378 Section 16140 Wiring Devices
Page 382 Section 16150 Motors
Page 390 Section 16170 Disconnect Switches
Page 392 Section 16180 Overcurrent Protective Devices
Page 396 Section 16200 Transfer Switches
Page 400 Section 16300 Surge Protective Device
Page 404 Section 16400 Service & Metering
Page 408 Section 16482 Variable-Frequency Motor Controllers
Page 420 Section 16485 Harmonic Filters
Page 426 Section 16500 Lighting
Page 430 Section 16921 Control System
Page 454 Section 16922 Programming Pump Station
Page 472 Section 16926 Telemetry Equipment
Page 476 Section 16934 Pressure & Differential Pressure Type Level Meters
Page 482 Section 16937 Level Switches
Page 488 Section 16943 Temperature Transmitters
Page 492 Section 16949 Position, Speed & Motion Measurement Devices
Page 496 Section VII Plans (Under Separate Cover)
Page 497 Section VIII Appendices
Page 498 Appendix A Wage Rates
Page 500 Appendix B City of Shoreline Construction Forms
Page 501 Request to Subcontract Work
Page 502 Request for Approval of Material
Page 503 Request for Information
Page 504 Contractor Change Order Request
Page 505 Material Substitution Request
Page 506 Transmittal for Non-Material Submittals
Page 507 Appendix C Permits
Page 509 Appendix D Geotechnical Report
Page 546 Appendix E Draft Stormwater Pollution Prevention Plan
Page 589 Appendix F Pump Station 30 Easement
Page 593 Appendix G Pump Station 30 Arborist Report
Page 608 Appendix H-1 Seattle City Light Standard Number 0101.75 - Excavating Near SCL Poles
Page 621 Appendix H-2 Seattle City Light Standard Number 1561.07 - Customer Requirements for Underground Secondary Service Termination Facilities
Page 631 Appendix H-3 Seattle City Light - Pole Hold: Request for Information
Page 634 Appendix H-4 Seattle City Light Service Construction Drawing - Work Order No. 2405555 Drawing No. SR#2319191
Page 636 Appendix I Inadvertent Discovery Plan
Page 654 Appendix J City of Shoreline Standard Plans