NW Innis Arden Way Boeing Creek Culvert Replacement Project (Hidden Lake - Phase 2) - Rebid, City of Shoreline, WA #1204054 - Appendices    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 1203 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Section VII Appendices
Page 2 Appendix A Wage Rates
Page 4 Appendix B Construction Forms
Page 5 Request to Subcontract Work
Page 6 Request for Approval of Material
Page 7 Request for Information
Page 8 Contractor Change Order Request
Page 9 Material Substitution Request
Page 10 Transmittal for Non-Material Submittals
Page 11 Appendix C City of Shoreline Standard Plans
Page 133 Appendix D Apprentice Utilization Requirement
Page 137 Appendix E Geotechnical Report and Summary Memo
Page 305 Appendix F Permits
Page 503 Appendix G Draft Construction Storm Water Pollution Prevention Plan
Page 672 Appendix H Cultural Resources Assessment for the Hidden Lake Dam Removal
Page 719 Appendix I Boeing Creek Flow Monitoring Data
Page 735 Appendix J City of Seattle Standard Specifications for Road, Bridge, and Municipal Construction
Page 805 Appendix K Easements and Right of Way Agreements
Page 860 Appendix L Critical Areas Report
Page 1198 Appendix M Site Photos