DJJC Security Remodel, Snohomish County, WA #PW-26-0749SB - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 357 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Notice of Call for Bids
Page 5 Instructions to Bidders
Page 11 Prevailing Wage Rates
Page 13 General Conditions
Page 27 Supplementary Conditions
Page 28 Bid Proposal
Page 29 Bidder's Checklist
Page 30 Bid Proposal Form
Page 32 Certification of Compliance with Wage Payment Statutes
Page 33 Bid Deposit / Bid Bond
Page 34 Statement of Bidder's Qualifications
Page 36 Contract Documents
Page 37 Contract Documents Checklist
Page 38 Agreement
Page 41 Exhibit A Insurance Requirements
Page 43 Performance, Payment & Warranty Bond
Page 45 Contractor's Declaration of Option for Management of Statutory Retained Percentage
Page 46 Assignment of Savings or Time Deposit Escrow Retained Percentage Holding Account
Page 47 Escrow Agreement Instructions
Page 48 Escrow Agreement
Page 50 Retainage Bond
Page 52 Section 000000 Project Cover
Page 53 Section 000101 Project Title Page
Page 55 Section 000102 Project Information
Page 57 Section 000103 Project Directory
Page 60 Section 000110 Table of Contents
Page 62 Section 004325 Substitution Request Form - During Procurement
Page 68 Section 005000 Contracting Forms & Supplements
Page 70 Section 006325 Substitution Request Form - During Construction
Page 74 Section 007100 Contracting Definitions
Page 78 Section 007200 Construction Conditions
Page 108 Section 011000 Summary
Page 112 Section 012100 Allowances
Page 116 Section 012129 Quantity Allowances
Page 118 Section 012200 Unit Prices
Page 122 Section 012500 Substitution Procedures
Page 126 Section 012501 Substitution Request Form
Page 130 Section 013000 Administrative Requirements
Page 144 Section 013114 Facility Services Coordination
Page 148 Section 013216 Construction Progress Schedule
Page 152 Section 013553 Security Procedures
Page 154 Section 014000 Quality Requirements
Page 162 Section 014100 Regulatory Requirements
Page 164 Section 014216 Definitions
Page 166 Section 014219 Reference Standards
Page 168 Section 014523 Testing & Inspection Services
Page 172 Section 014533 Code-Required Special Inspections & Procedures
Page 178 Section 015000 Temporary Facilities & Controls
Page 182 Section 015100 Temporary Utilities
Page 186 Section 015213 Field Offices & Sheds
Page 188 Section 015500 Vehicular Access & Parking
Page 192 Section 015813 Temporary Project Signage
Page 194 Section 016116 Volatile Organic Compound (VOC) Content Restrictions
Page 196 Section 017000 Execution & Closeout Requirements
Page 210 Section 017419 Construction Waste Management & Disposal
Page 218 Section 017610 Temporary Protective Coverings
Page 220 Section 017800 Closeout Submittals
Page 226 Section 024100 Demolition
Page 230 Section 030100 Maintenance of Concrete
Page 238 Section 030500 Concrete Floor Sealer
Page 242 Section 033000 Cast-In-Place Concrete
Page 252 Section 033511 Concrete Floor Finishes
Page 256 Section 051200 Structural Steel Framing
Page 260 Section 064100 Architectural Wood Casework
Page 266 Section 076200 Sheet Metal Flashing & Trim
Page 270 Section 079200 Joint Sealants
Page 280 Section 083100 Access Doors & Panels
Page 284 Section 084313 Aluminum-Framed Storefronts
Page 292 Section 087100 Door Hardware
Page 310 Section 087113 Power Door Operators
Page 314 Section 088000 Glazing
Page 324 Section 092116 Gypsum Board Assemblies
Page 330 Section 092216 Non-Structural Metal Framing
Page 334 Section 096263.13 Stainless Steel Wall Base
Page 338 Section 099123 Interior Painting
Page 346 Section 102600 Wall & Door Protection
Page 350 Section 123600 Countertops
Page 356 Section 124813 Entrance Floor Mats & Frames